05/02/2026
Interesting job today, customer needed stainless steel sink moving over to accommodate a new larger make-line. New water supply now installed through the top of the unit and new waste pipe installed. A little tricky due to the old waste pipe fixed behind the chiller wall with no movement on it. Sink moved over to the right hand side ready for the new make-line.