CK Steel and Sheeting

CK Steel and Sheeting 18 Years Experience in; Steel Erecting, Sheeting, and Fabrication. All aspects of these undertaken

⛰️ 7 lakeside cabin roofs cladded ⛰️ ⛰️ Steadmans anthracite as30 ⛰️ 🌧️ Watertight ready for Winter 🌧️
25/08/2026

⛰️ 7 lakeside cabin roofs cladded ⛰️
⛰️ Steadmans anthracite as30 ⛰️
🌧️ Watertight ready for Winter 🌧️

🏴󠁧󠁢󠁳󠁣󠁴󠁿 100ft x 80ft In East Lothian 🏴󠁧󠁢󠁳󠁣󠁴󠁿 🏴󠁧󠁢󠁳󠁣󠁴󠁿 Galvanised Steelwork 🏴󠁧󠁢󠁳󠁣󠁴󠁿 🏴󠁧󠁢󠁳󠁣󠁴󠁿 Anthracite Cement Fibre Roof 🏴...
23/07/2026

🏴󠁧󠁢󠁳󠁣󠁴󠁿 100ft x 80ft In East Lothian 🏴󠁧󠁢󠁳󠁣󠁴󠁿
🏴󠁧󠁢󠁳󠁣󠁴󠁿 Galvanised Steelwork 🏴󠁧󠁢󠁳󠁣󠁴󠁿
🏴󠁧󠁢󠁳󠁣󠁴󠁿 Anthracite Cement Fibre Roof 🏴󠁧󠁢󠁳󠁣󠁴󠁿
🏴󠁧󠁢󠁳󠁣󠁴󠁿 Ready For Walls Shuttered 🏴󠁧󠁢󠁳󠁣󠁴󠁿

☀️ ⚡️ Over 1000 square metres of roofs made good ready for solar panels. ⚡️ ☀️ Roof 1 Sharmans lap edge treatment and ro...
21/07/2026

☀️ ⚡️ Over 1000 square metres of roofs made good ready for solar panels. ⚡️ ☀️

Roof 1
Sharmans lap edge treatment and roof-lights covered. Ready for solar. ☀️ ⚡️

Roof 2
Asbestos over lay, Georgian windows removed and made flush with existing roof. Z bars fitted with rock-wool in between and a 0.7 top sheet fitted. Over 120 metres of Sharmans gutter liner fitted, parapet wall Cladded and flashed. ☀️ ⚡️

Roof 3
Old composite roof overlaid made watertight again ready for solar. ☀️ ⚡️

🌲 Roy Perfect  Christmas Trees 🌲 🚜 & Tractor Parts 🚜 🌲 Asbestos Off 🌲 🚜 40mm Insulated On 🚜 🌲 Anthracite Sheets With Bla...
10/05/2026

🌲 Roy Perfect Christmas Trees 🌲
🚜 & Tractor Parts 🚜
🌲 Asbestos Off 🌲
🚜 40mm Insulated On 🚜
🌲 Anthracite Sheets With Black Flashings 🌲
🚜 Any one after a quote Get in touch 🚜

⚽️ 2 Free Tickets For This Sunday ⚽️⚽️ Waterworks End ⚽️⚽️ Carlisle VS Boreham Wood - Semi Final ⚽️⚽️ 03/05/26.  ⚽️  12:...
30/04/2026

⚽️ 2 Free Tickets For This Sunday ⚽️

⚽️ Waterworks End ⚽️

⚽️ Carlisle VS Boreham Wood - Semi Final ⚽️

⚽️ 03/05/26. ⚽️ 12:30 Kick Off ⚽️

⚽️ Follow Our Page, Like & Share This Post ⚽️

⚽️ Tag a friend who you would take. ⚽️

⚽️ Winner will be drawn 12pm Saturday. ⚽️

⚽️ Best of Luck ⚽️ ⚽️”Que, sera, sera” ⚽️

✅ 150ft x 50ft x 20ft to eves.✅ Cumbria Steelworks Building.✅ Another one complete.✅ Up there with 1 of the best prepped...
25/04/2026

✅ 150ft x 50ft x 20ft to eves.
✅ Cumbria Steelworks Building.
✅ Another one complete.
✅ Up there with 1 of the best prepped sites.
✅ Anthracite C-Fibre Roof.
✅ Yorkshire Boards 3m down.
✅ Sterling Effort from the lads 👏💪
✅ Any one after a quote get in touch

✅ 80ft long x 60ft wide 16ft to eves.✅ 4 no 20ft bays.✅ 2 no 1m concrete panels.✅ Juniper green side cladding.✅ Cement f...
07/04/2026

✅ 80ft long x 60ft wide 16ft to eves.
✅ 4 no 20ft bays.
✅ 2 no 1m concrete panels.
✅ Juniper green side cladding.
✅ Cement fibre roof.
✅ Galv gutters.
✅ 2 roller shutter doors.
✅ 1 personnel door.
✅ Foundations fitted.
✅ Supplied, Erected, Clad, Completed.👍

Address

Carlisle
CA57

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm
Sunday 9am - 5pm

Telephone

07533473836

Alerts

Be the first to know and let us send you an email when CK Steel and Sheeting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share