13/01/2023
A HANDOVER SURVEY SURVEY ON A NEW BUILD IN WIMBLEDON. THE DEVELOPER HAS HAD SOME DAMP ISSUES IN THE FORM WORK BASEMENT AND THE DRIVE HAS BEEN EXCAVATED AROUND THE PROPERTY TO ALLOW FOR A LAND/FRENCH DRAIN INSTALL THEN ACO ABOVE. THE RESIN BOND IS ALSO GOING AND ITS TO BE TARMACED ONCE DRAINS ARE IN. WILL BE RETURNING TO SITE FOR A DAY OF ROOT REMOVAL NEXT WEEK