Tommy Harpers construction and maintenance

Tommy Harpers construction and maintenance Free Quotes and advice

23/07/2024
miniature front garden wall taken down and rebuilt the same , nice and easy one.
23/07/2024

miniature front garden wall taken down and rebuilt the same , nice and easy one.

double skinned wall built , sandstone copings put on , quick wire brush over the lot. please appreciate how good it look...
06/07/2024

double skinned wall built , sandstone copings put on , quick wire brush over the lot. please appreciate how good it looks ;) . don't worry about the missing coping stone only 4 months wait for another ;)

Stairs adjusted into a lovely old school look , Mosaic Floor put down. radiator changed. painted. A lot of time went int...
23/06/2024

Stairs adjusted into a lovely old school look , Mosaic Floor put down. radiator changed. painted. A lot of time went into this.

Kitchen ripped out, walls opened up , floors and drains taken out and after all the hard work we are left with this beau...
19/06/2024

Kitchen ripped out, walls opened up , floors and drains taken out and after all the hard work we are left with this beautiful kitchen.

Lovely little extension built and rendered, Ready for roofers.
17/06/2024

Lovely little extension built and rendered, Ready for roofers.

wooden stairs and stud wall fitted.
17/06/2024

wooden stairs and stud wall fitted.

Garage extended and revamped.built in block and bricks , rendered ,windows fitted ,doors fitted, tiled , new floor, new ...
17/06/2024

Garage extended and revamped.
built in block and bricks , rendered ,windows fitted ,doors fitted, tiled , new floor, new roof and painted.

Address

Cheltenham

Website

Alerts

Be the first to know and let us send you an email when Tommy Harpers construction and maintenance posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Tommy Harpers construction and maintenance:

Share