20/08/2026
The toughest infrastructure projects demand smarter engineering.
For Thames Water's new Guildford Sewage Treatment Works, the challenge was clear: deliver safe, high-load access structures capable of performing in a corrosive wastewater environment for decades to come.
Using BIM-led design, Dura Composites engineered bespoke dΒ² Dura Access Structures and dΒ² Dura Slab walkways to support 10kN loading requirements while reducing weight, simplifying installation and minimising long-term maintenance.
It's a great example of how the right materials and engineering approach can help future-proof critical infrastructure.
π Read the project: https://f.mtr.cool/cqpwucrtjd