04/09/2022
Photo dump, maintenance work carried out today this primary/secondary school wanted to remove the urinals as the children kept on blocking them up with paper and change the 3 basins as one was cracked and wanted non concussive taps fitted so new basins with non concussive taps. New siphon fitted to fix the no flush, new thermostatic tap fitted for disability basin.