30/08/2021
Throwback to June this year with a big thanks to Michael and the boys for completing our biggest track sawing job to date. 300 metres at 600mm thick, along with 700 x 152mm core holes to detach steel beams, and prevent over cut into the retained Structure. Great stuff lads 👍👍