Clerwood Building company

Clerwood Building company Voted Scotlands best attic conversion company2023/2024/2025 specialists in installing/replacing roof windows⭐️

⭐️⭐️⭐️⭐️⭐️END OF WEEK 2 UPDATE 🏠🔨What an unbelievable effort from the full team this week 👏👏From the initial rip out to ...
05/09/2026

⭐️⭐️⭐️⭐️⭐️

END OF WEEK 2 UPDATE 🏠🔨

What an unbelievable effort from the full team this week 👏👏

From the initial rip out to reaching this stage in just two weeks is some going. There has been a huge amount of structural work involved in this one and we couldn’t be happier with the progress made so far 💪

All structural works are now completed ✅

The steels have been installed as per the engineer’s drawings, joists have all been doubled up and trebled where applicable, with the same structural detail carried out to the rafters throughout 🔩🪚

Both dormer structures have now taken shape, internal framing is progressing well and you can really start to see the size and layout of the new space coming together 🏠📐

This progress only happens when every member of the team is pulling in the same direction. From the guys carrying out the rip out, structural works, joinery, roofing and everything in between, it has been a proper team effort from start to finish 👏

Proud of every single member of our squad 💪❤️

Couldn’t be happier with the team we have around us. From rip out to this stage in two weeks is an amazing effort and a real credit to everyone involved 🙌

Onto week 3 👊🏠

03/09/2026

⭐️⭐️⭐️⭐️⭐️
🏠 A little help from our followers, please…

We’re currently looking at taking the next step with Clerwood Building Company and are on the lookout for a suitable shop or commercial premises in and around the Corstorphine area.

The idea would be to create a space where we can showcase some of our work, meet with new and existing clients, and have a proper Clerwood hub that people can visit to sit down, discuss ideas and talk through future projects with us.

Ideally, we’d be looking for somewhere available to buy or rent, but we’d also be very grateful to hear from anyone who may be considering selling or renting out a property in the near future that perhaps hasn’t made it onto the market yet.

If anyone knows of anything that may be suitable, or knows someone who might, please feel free to send us a message.

Any help, recommendations or shares would be very much appreciated.

Thank you as always for the continued support 👏

Clerwood Building Company

⭐️⭐️⭐️⭐️⭐️🔨 MIDWEEK UPDATE – WEEK 2 🔨Midway through our second week and the back elevation dormer is now built, with OSB...
02/09/2026

⭐️⭐️⭐️⭐️⭐️
🔨 MIDWEEK UPDATE – WEEK 2 🔨

Midway through our second week and the back elevation dormer is now built, with OSB board installed to the face and dormer cheeks. The declevities running from the back to the front are also now installed, along with the 18mm ply 👷‍♂️🔨

Our roofing department are now in completing the lead watergates, and tomorrow the insulation will be installed on top to form the warm roof as per the architect’s drawings. Once complete, the single ply membrane will then be laid 🏠✅

The windows have also been ordered and are due in the coming weeks. Once they arrive, we’ll strap the dormer and get everything prepared ready for the external cladding 🪟👌

Tomorrow we’ll be looking to have the rear dormer 100% watertight, install the steel to the front elevation and, with a bit of luck, have the front dormer built this week too 🤞💪

A huge amount of work completed already and we’re only midway through week two 👏🔨

Great progress from the whole team ❤️🏠

⭐️⭐️⭐️⭐️⭐️🥳🥳 IT’S DORMER DAY! 🥳🥳After a huge amount of preparation, today’s the day we finally open up the roof and get ...
31/08/2026

⭐️⭐️⭐️⭐️⭐️

🥳🥳 IT’S DORMER DAY! 🥳🥳

After a huge amount of preparation, today’s the day we finally open up the roof and get started on the rear dormer!

Everything underneath has been getting prepared ready for this point. The attic has been fully stripped back, structural works are well underway, existing joists have been strengthened and doubled where required, new structural timbers are in, steelwork is in place and the roof has been prepared ready for us opening up today.

The scaffold is up, materials are ready and it’s all hands on deck this morning 👷‍♂️🔨

The weather might not be giving us the perfect day for it 🌧️😂 but unfortunately we can’t wait around for a nice sunny day in Scotland! We’ll keep a close eye on it, work safely and get the roof opened, protected and the new dormer structure moving.

This is always one of our favourite stages of an attic conversion. After all the work that goes on behind the scenes and underneath the floor, this is when you really start to see the transformation taking shape.

Big day ahead for the Clerwood team ❤️

Let’s build a dormer! 🔨🏠

30/08/2026

⭐️⭐️⭐️⭐️⭐️Sunday thoughts…⭐️⭐️⭐️⭐️⭐️

A QUICK THOUGHT ON THE CHANGES BEING PROPOSED FOR THE BUILDING INDUSTRY

There’s still a lot to be worked out, but from what we’ve seen so far, much of what is being discussed seems to be heading in the right direction.

For us, the biggest positive is the push towards higher standards, clearer accountability and giving customers more confidence when choosing who they trust with their home.

We have always believed that a building company should be judged on far more than just the figure at the bottom of an estimate. The way a company operates, communicates, plans, protects the client, looks after its team and stands behind its work should matter just as much.

That is the standard we continue to build our own company around.

At Clerwood Building Company we already place a huge emphasis on:

• Full Public Liability and Employers’ Liability insurance
• RAMS, method statements and site inductions
• Dedicated health and safety support
• Proper site protection and safe working practices
• Qualified and experienced trades carrying out the relevant works
• Working from architects’ and structural engineers’ drawings where required
• Clear and detailed estimates based on the actual scope of works
• Written contracts, payment schedules and terms and conditions
• Transparency around exactly what is included within the agreed price
• A 10 year workmanship guarantee
• TrustMark registration
• VELUX Certified Installer status
• Building regulation compliance
• Structural and fire safety requirements
• Proper scaffolding and access equipment where required
• Keeping clients updated throughout their project
• Maintaining photographic records of our work
• Years of completed projects for potential clients to view
• A team of trusted trades who work together regularly
• Standing behind the work we complete
• Continually improving our systems, standards and the way we operate

Something else we really value in this industry is the relationship between good building companies.

People who follow our page will probably notice other local builders regularly liking or commenting on our work, and you will see us doing the same with theirs.

There is more than enough work out there for good companies. We respect businesses that take pride in what they do, and healthy competition only encourages everyone to keep raising their standards.

We certainly don’t think regulation should make things unnecessarily difficult for hardworking tradespeople or small businesses, and the detail of any new system will be important.

But if the end result is that customers have more confidence, responsible companies are recognised for doing things properly and standards across the industry continue to rise, then we believe that can only be a positive thing.

We are proud of how far Clerwood Building Company has come, the standards we have put in place and the team we have built around us.

For us, it has always been about doing things properly, continuing to raise our standards, building a team we are proud of and leaving every project with a client who would happily recommend us. ❤️

⭐️⭐️⭐️⭐️⭐️What a start to this project! 🔨🏠The existing conversion has now been fully stripped out, taking everything rig...
27/08/2026

⭐️⭐️⭐️⭐️⭐️What a start to this project! 🔨🏠

The existing conversion has now been fully stripped out, taking everything right back ready for the new structure to begin.

So far this week we have:

🔨 Fully stripped out the existing conversion
🧱 Taken down the brick wall to create the opening for the future staircase
🏗️ Measured and ordered all necessary steelwork ready for fitting tomorrow
🪜 Erected all necessary scaffolding for both dormers
🚛 Skip onsite and keeping everything organised
🪵 All structural timbers delivered
🔩 Around half of the existing joists already doubled up ready for the new floor structure

As you can see from the photos, health and safety is also something we take extremely seriously.

We now have a dedicated Health & Safety Officer working alongside us to make sure we are complying with all necessary procedures throughout our projects and, most importantly, doing everything possible to make sure every tradesman goes home safely to their family at the end of each day. 👷‍♂️❤️

Tomorrow’s aim is to get the steel beams installed and continue pushing on with the structural works throughout Saturday.

The team are working this Saturday to make sure we are fully prepared going into next week, when the exciting part really begins, opening up the roof and starting construction of the new rear dormer. 🏠🔨

A brilliant effort from everyone so far.

One team, all pulling in the same direction and striving for the same thing. ❤️

⭐️⭐️⭐️⭐️⭐️🏠🔨 NEW ATTIC CONVERSION STARTED TODAY! 🔨🏠Another exciting project underway for the Clerwood team today, and th...
24/08/2026

⭐️⭐️⭐️⭐️⭐️
🏠🔨 NEW ATTIC CONVERSION STARTED TODAY! 🔨🏠

Another exciting project underway for the Clerwood team today, and this one is going to be some transformation! 🙌

As you can see from the before photos, the existing attic is currently accessed by a loft ladder from the upper landing. Over the coming weeks we’ll be completely transforming this space and creating two new rooms along with a brand new shower room, giving our clients a huge amount of additional usable space within their home. 🏡✨

First things first though, and that’s a complete rip out! 💪🔨

Everything in the existing attic will be stripped right back to the original joists and rafters, including the removal of all previous insulation, leaving us with a completely blank canvas ready for a total overhaul.

From there, the real transformation begins. 👌

To the rear, we’ll be constructing a substantial new dormer incorporating four windows across the elevation, completely opening up the available floor space and creating the room required for the new layout.

At the front of the property, a further dormer will be formed to provide the necessary headroom for the new staircase, allowing us to replace the existing loft ladder with a proper staircase and create a seamless connection between the existing home and the new attic conversion. 🔨

The project will include all structural alterations, dormer construction, new staircase, full insulation to current requirements, new shower room, plastering and all associated finishing works.

By the time we’re finished, what is currently an underused attic space will provide the clients with two additional rooms and a shower room, a massive transformation without having to extend the footprint of the property. 🙌🏠

We’ll be documenting this one from the very beginning right through to completion, so keep an eye on the page over the coming weeks to see it all take shape. 📸👀

Plenty of work ahead, but this is exactly the type of project we love! ❤️🔨

Clerwood Building Company Ltd

Scotland’s No.1 Attic Conversion Specialists 🏆

⭐️⭐️⭐️⭐️⭐️          👷‍♂️ WELCOME TO THE TEAM, SCOTT! 👷‍♂️A big welcome to the newest member of the Clerwood Building Com...
24/08/2026

⭐️⭐️⭐️⭐️⭐️

👷‍♂️ WELCOME TO THE TEAM, SCOTT! 👷‍♂️

A big welcome to the newest member of the Clerwood Building Company team, Scott, who officially joins us today! 🏠🔨

We’re all delighted to have him on board and looking forward to getting him settled in with the rest of the boys.

We’ve worked hard over the years to build a really close knit team at Clerwood, where everyone gets on, has a laugh and helps each other out, while still working hard and keeping the standards high. We’re sure Scott will fit right in and, hopefully, love being part of what we’re building here. 🙌

Scott comes in at an exciting time for the company, with plenty of brilliant projects ahead and some big plans for the future. It’s great to be able to add another member to the team as we continue to grow. 📈🏠

Scott in the middle here, being welcomed into the team from day one! 🤝😂 Safe to say it didn’t take the boys long to make him feel at home!

Welcome to Clerwood, Scott! 🔨

Here’s to an exciting future ahead! ❤️

⭐️⭐️⭐️⭐️⭐️🏠✨ Another attic transformation complete… and bang on schedule! 🔨👏What a difference on this one! 🤩🙌We’ve inclu...
21/08/2026

⭐️⭐️⭐️⭐️⭐️
🏠✨ Another attic transformation complete… and bang on schedule! 🔨👏

What a difference on this one! 🤩🙌

We’ve included some of the original photos 📸, architectural drawings 📐 and finished pictures alongside this post as we think they really show just how much work has gone into completely transforming this space.

📅 This project was booked into our diary for exactly 7 weeks, from the initial full strip out right through to completion, and we’re delighted to say we have hit that programme bang on target! 🎯✅

When we first arrived, the existing attic was essentially a makeshift DIY conversion which had been carried out previously and unfortunately wasn’t to the standard required. The decision was therefore made to strip everything right back 🔨 and start again, following the architectural and structural drawings throughout to create a proper, safe and usable additional room and bring everything up to the required current standards. 🏠✅

One of the biggest transformations on this project has actually been the staircase and hallway. 🪚✨

Looking at the before pictures, you can see just how enclosed the original staircase was. The new staircase was upgraded by our clients and we think it was a great choice 👌 Along with the alterations to the layout, it has completely changed the feel of the area and gives a much greater feeling of space.

🪟 We also installed two new windows on the first floor, while the existing window at the stairwell was changed to a new fixed toughened pane for safety purposes as part of the alterations. ✅

Upstairs, the old makeshift attic has been completely transformed into a bright, properly constructed and finished room 🏠✨ with new roof windows, insulation, flooring, electrics, doors, bespoke storage and all associated works completed throughout. 🔨⚡️🪚

⏱️ Something we take a lot of pride in as a company is our timescales.

We organise our diary very carefully and allocate the correct amount of time to every project before we start. It allows us to finish one project properly before moving onto the next and, most importantly, means our next client isn’t left waiting because the previous job has overrun. 📅🤝

Wherever possible, we will always look to pull a client’s start date forward ⏩ but never push it back. We think turning up when we said we would is one of the most important ways to start any project on the right footing. 🤝🏠

📅 7 weeks allocated ✅
🔨 Full strip out and rebuild ✅
🎯 7 weeks completed ✅

A massive well done and thank you as always to everyone involved. Another brilliant effort from the full team! 👏👏🔨

Onto the next one! 🏠🔨💪

Clerwood Building Company Ltd

Address

Corstorphine
Edinburgh
EH128

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+447591018197

Alerts

Be the first to know and let us send you an email when Clerwood Building company posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Clerwood Building company:

Share