Brenton Bastin Construction

Brenton Bastin Construction Construction, conservation, restoration, civil engineering, groundworks, design and management. All trades. Craftsman. Stone Masons. Carpentry.

Restoration sandblasting. Heritage lime building.

1974 Mini Cooper Innocenti.Full restoration nearly complete and now on the road.Only taken 20 years ! Exterior photos.
15/02/2025

1974 Mini Cooper Innocenti.
Full restoration nearly complete and now on the road.
Only taken 20 years !
Exterior photos.

19/10/2024

Man of the match in last Saturday’s match (better late than never) vs Newquay AFC was Lucas McGahey. Well played Lucas. Lucas was presented the award by Rania from Jurassic Tents And Events. Thank you for your support, Brenton and Rania.
🐅 🧡 ⚽️

06/10/2024

Man of the match in today’s match vs Newton Abbot Spurs A.F.C was Bailey Galloway. Well played Bailey. Bailey was presented the award by Rania from Brenton Bastin Construction. Thank you for your support, Brenton and Rania.
🐅 🧡 ⚽️

13/03/2024

Next up, we welcome Cullompton Rangers Football Club to Tiger Way on Saturday. Come on down to cheer on the lads! Thank you to Brenton Bastin Construction, our match sponsor, for your support.
🐅 🧡 ⚽️

Kitchen build with 80mm Dartmoor Ash, 50 mm Douglas Fir, 35 mm french oak and 40 mm one piece, cut and grooved slate ove...
08/09/2022

Kitchen build with 80mm Dartmoor Ash, 50 mm Douglas Fir, 35 mm french oak and 40 mm one piece, cut and grooved slate over Belfast sink. All doors now being prepared in oak. Kitchen will be completed when new window is installed then plastered and decorated.

Scaffolding up ready for roof works on this Log cabin build.
08/09/2022

Scaffolding up ready for roof works on this Log cabin build.

Horrabridge project update…Complete roof restoration and replacement of aged valley. Working 18-20 hrs shifts into the n...
06/03/2022

Horrabridge project update…
Complete roof restoration and replacement of aged valley. Working 18-20 hrs shifts into the night. After big storms and extreme weather.
Old roof was collapsing and leaking through delaminated Delabole, prone to this after 100 years of frost action. Timbers were rotten all round and valley leaking heavily.
All inferior timber removed and replaced. Fully insulated throughout.
Complete new roof system, Tyvek weather sheild, Brazilian slate, Valley timber and lead.
Fascia, soffit, gutters, downpipes, ridge.
Fire breathing below through lead ridge outlet.
🙏

Horrabridge projects continued….Full restoration of fireplace and blue limestone hearth completed.Full chimney restorati...
03/02/2022

Horrabridge projects continued….
Full restoration of fireplace and blue limestone hearth completed.
Full chimney restoration with liner fitted and log burner installation completed.
Blue limestone floor throughout the building completed.
Full restoration of pine stair case and beams completed.
🙏

Horrabridge Projects continued…Ground floor blue limestone laid through out. Blue lime stone Hearth with log burner inst...
03/02/2022

Horrabridge Projects continued…
Ground floor blue limestone laid through out.
Blue lime stone Hearth with log burner installed under fully restored fireplace 🙏

Horrabridge project continued ….Restoration of this fireplace completed.A reclaimed granite lintel and lime restoration ...
03/02/2022

Horrabridge project continued ….
Restoration of this fireplace completed.
A reclaimed granite lintel and lime restoration with all stone used from existing fireplace and grounds of property.
Now ready for blue Limestone floor throughout with blue limestone hearth and log burner.

Horrabridge Project continued … Full restoration of this fire place ongoing …A reclaimed granite lintel from a railway s...
03/02/2022

Horrabridge Project continued …
Full restoration of this fire place ongoing …
A reclaimed granite lintel from a railway station platform fitted and nhl 3.5 st Astier Lime with graded sand. All stone was removed from existing fireplace and it’s add ons through the buildings 300 year history. Surplus stone gathered from the gardens and grounds.
Chimney restored and swept throughly.
Full liner fitted ready for burner.
Building masonry removed and then replaced at bend in chimney to guide liner through bend perfectly. This also gives a chance to remove any left over waste from inside chimney above and below.

Horrabridge project continued with first fix of this bespoke kitchen before dismantling and preparing all timber for fin...
03/02/2022

Horrabridge project continued with first fix of this bespoke kitchen before dismantling and preparing all timber for finish. Sanded through the grades up to 2000 and treated with Osmo top oil.
Worktop is 80mm Dartmoor Ash. The units and doors are made with 50mm Douglas Fir and 30mm oak to Belfast Sink. A one piece bespoke cut 40mm slate drain worktop to Belfast will be installed. With drainage groove cut to depth and edges honed and rounded - this will be fitted when kitchen refitted after prep and oils. A blue Limestone floor has been laid.
Please follow posts for the completed kitchen.

Address

Exeter

Alerts

Be the first to know and let us send you an email when Brenton Bastin Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Brenton Bastin Construction:

Share