09/10/2026
The guys are making good progress on this particularly difficult site at a particularly wet time. Because of the peat on this site the highland council planning department were mindful to prevent as much peat disturbance as possible to prevent carbon release. Because of this Striking Designs had to design this new build in a much more unconventional way, building a steel frame on top of concrete colums. Metal trays are then fixed onto the steel base and concrete is poured into this to form a suspended concrete floor which we can then erect this superstructure onto. Not the easiest of jobs but the spot was important to achieve the amazing views of Eigg and Muck. Completion coming soon 🏠