PREAH Building Services

Call Directions Website Contact the business

PREAH Building Services With over 20 years of experience, PREAH Building Services provides mechanical & electrical building services to commercial clients throughout Central Scotland.

PREAH specialises in the supply, installation, and maintenance of all mechanical & electrical Building Services, including plumbing, refrigeration, electrical, air conditioning, and heating.

With considerable experience in public and private sectors, we cover all aspects of mechanical & electrical building services, from design and build projects, to fully-designed consultant-led specified projects.

It was great for PREAH to join Tilbury Douglas at their annual Supply Chain Event this morning at the Trades Hall in Gla...
30/10/2026

It was great for PREAH to join Tilbury Douglas at their annual Supply Chain Event this morning at the Trades Hall in Glasgow.

Having worked alongside Tilbury Douglas for many years, we are proud to remain a trusted supply chain partner, supporting the delivery of projects across Scotland.

Our longstanding relationship is built on collaboration, shared values and a commitment to delivering high standards. We were especially pleased to see this recognised in November 2024, when PREAH received the Outstanding Service in Social Value Award at the Tilbury Douglas Northern Supply Chain Roadshow.

A big thank you to the Tilbury Douglas Scotland team for bringing everyone together and for their continued support. We look forward to many more years of working together.

If you've ever walked along the Clyde at Finnieston, you'll know the distinctive round brick building on Tunnel Street: ...
21/10/2026

If you've ever walked along the Clyde at Finnieston, you'll know the distinctive round brick building on Tunnel Street: the North Rotunda - and behind its familiar appearance lies a fascinating piece of Glasgow's industrial history.

Built in the 1890s, the North Rotunda was once the entrance to an underground crossing beneath the River Clyde, connecting Finnieston with Govan on the opposite bank.

In those days, horses and carts carrying goods could enter the Rotunda and be lowered approximately 24 metres underground by enormous hydraulic lifts. From there, they travelled through tunnels beneath the river before being lifted back to street level at the South Rotunda. A separate tunnel allowed pedestrians to make the same crossing on foot.

The tunnels have long since closed, but the North Rotunda has remained a familiar feature of Glasgow's riverfront. Listed in 1986, the building has enjoyed several different uses over the decades, including spells as a casino and restaurant.

Now, this remarkable piece of Glasgow's industrial heritage is being given a new lease of life.

The building is undergoing an exciting transformation into a modern entertainment and events venue, with plans for live music, dining, a cocktail bar and flexible event spaces across three levels. The venue is scheduled to reopen in May 2027.

PREAH is delighted to be involved in this landmark refurbishment, having been appointed by valued client Thomas Johnstone Ltd to deliver the MEP services.

Our team is seeing great progress on site and the refurbishment continues to take shape. Working within a building of this age and unusual circular design brings its own unique challenges, requiring careful planning, coordination and a thoughtful approach to installation. It's exactly the kind of project that makes our work so interesting and rewarding.

It's a privilege to help bring new life and purpose to such an iconic landmark that has been part of Glasgow's history for more than 130 years and we're looking forward to seeing the North Rotunda enter its next chapter.

This World Mental Health Day, the theme “Lived experiences heard: real voices, real change” is a reminder of just how im...
09/10/2026

This World Mental Health Day, the theme “Lived experiences heard: real voices, real change” is a reminder of just how important it is to take the time to listen, understand and support one another.

Whether we're on site, in the office or working with our customers, looking out for the people around us is just as important as the work we do.

It's a good reminder to check in with colleagues, make time for a conversation and remember that even the smallest gesture of kindness or understanding can make a real difference.

We’re pleased to welcome 9 new apprentices to PREAH as part of this year’s apprentice intake.Apprenticeships continue to...
24/09/2026

We’re pleased to welcome 9 new apprentices to PREAH as part of this year’s apprentice intake.

Apprenticeships continue to play an important part in how we develop skills and create long-term career opportunities within the business. With our latest intake, we now have 16 apprentices across a total workforce of 112, meaning apprentices alone make up more than 14% of our team.

We’re also proud to continue our membership of The 5% Club, reflecting our ongoing commitment to investing in people, developing talent and providing opportunities to learn, progress and build a career within the building services industry.

For us, apprenticeships are about much more than gaining a qualification - they give people the opportunity to learn from experienced colleagues, develop practical skills and become an important part of the team from day one.

We’re looking forward to supporting our newest apprentices as they develop their knowledge and experience, and to seeing where their careers with PREAH take them.

Welcome to the team, 2026 Apprentices!

On Sunday 13 September, our team successfully completed a planned lifting operation as part of the ongoing refurbishment...
17/09/2026

On Sunday 13 September, our team successfully completed a planned lifting operation as part of the ongoing refurbishment works at Exchange Place in Fountainbridge, being carried out on behalf of valued client, GM Projects (Scotland) Ltd.

The works involved the removal of an existing chiller unit, previously decommissioned by PREAH, followed by the lifting and positioning of seven new Mitsubishi City Multi R32 VRF condensing units, a GRP enclosure and a new 12-way electrical panel board.

The lift marks another important stage in a 20-week programme covering the refurbishment of three floors of the building.

PREAH’s wider scope includes the full installation of new VRF air conditioning across all three floors, electrical works including lighting and small power, secondary ventilation, fire alarm installation and new sanitaryware serving a new wellness area.

With all planned equipment safely lifted and positioned, the operation was completed successfully. We'd like to thank everyone involved in the planning, coordination and delivery of this milestone for their great teamwork.

Sometimes, “Are you okay?” isn’t quite enough. If you’re seriously worried about someone, it’s okay to say the word out ...
10/09/2026

Sometimes, “Are you okay?” isn’t quite enough. If you’re seriously worried about someone, it’s okay to say the word out loud: “Are you thinking about su***de?”

It can feel like an incredibly difficult question to ask. But talking openly about su***de does not put the idea into someone’s head. A direct conversation can give someone the opportunity to say what they’re really going through and, importantly, to get support.

This year, Samaritans are reminding us that suicidal thoughts CAN be interrupted. Sometimes a conversation, a phone call, a cup of tea or simply taking the time to notice that somebody isn’t themselves can make more difference than we know.

Look out for the people around you. . And don’t be afraid to say the words.

If you’re struggling, or you’re worried about someone else, Samaritans are available free, day or night, on 116 123.

PREAH is delighted to be playing a part in the next chapter of another one of Glasgow’s most historic buildings.Set with...
31/08/2026

PREAH is delighted to be playing a part in the next chapter of another one of Glasgow’s most historic buildings.

Set within Pollok Country Park, the Category A-listed former Pollok House Stables include structures dating mainly from the 17th to the 19th centuries, with the site’s history stretching back even further.

Working on behalf of our valued client, Morrison Construction, PREAH is delivering a range of mechanical services as part of the wider redevelopment of the stables, sawmill and new visitor facilities into a net zero carbon Living Heritage Centre.

Our works include the design and installation of new building management controls, underfloor heating and ventilation, alongside new WC facilities and upgrades to the heating and domestic water systems.

Working within a historic building beside the White Cart Water brings some unusual engineering considerations. Due to flood risk, new plant is being installed approximately 850mm above floor level, helping to protect the building’s new services while respecting the character and constraints of the existing structure.

Our works began in May 2026, with the project currently scheduled to continue into Spring 2027.

From centuries-old stonework to modern, energy-conscious building services, this is a project where Glasgow’s heritage and future come together.

PREAH is proud to support Morrison Construction and to be part of the continuing story of Pollok Stables.

We’re pleased to share another major contract win for our FM Division, strengthening our growing presence in the retail ...
18/08/2026

We’re pleased to share another major contract win for our FM Division, strengthening our growing presence in the retail and commercial sector.

Our team has been appointed to deliver Hard FM services at Ocean Terminal Shopping Centre in Edinburgh, with the contract commencing in August 2026.

The scope covers planned preventative maintenance, reactive call-outs and project works across a wide range of critical building services, including:

• High and low voltage electrical installations
• Electrical inspection, condition and reporting
• HVAC systems
• Pressurisation systems
• Gas boilers and LTHW systems
• VRF/VRV systems
• Domestic water systems
• Water sampling
• Drainage systems

We’ll also be supporting electrical small works and lighting upgrades across the centre.

This is an excellent addition to our FM portfolio and reflects the strength of our technical capability, responsive service and commitment to delivering reliable, high-quality facilities management solutions.

A great result for everyone involved in securing the contract, and we look forward to developing a strong partnership with the Ocean Terminal team.

When temperatures rise, the pressure on building systems rises with them.HVAC, cooling equipment, electrical systems and...
12/08/2026

When temperatures rise, the pressure on building systems rises with them.

HVAC, cooling equipment, electrical systems and other critical assets can all be working harder and that is often when underlying issues start to show.

Proactive maintenance can help identify problems early, reduce the risk of unexpected breakdowns and keep your building comfortable, efficient and operational.

PREAH's Facilities Management division supports commercial customers across Scotland with planned and reactive building services, including HVAC, electrical and plumbing.

Is your building ready for the warmer weather?

We can help. Email us: [email protected]

Our Facilities Management team has successfully completed the installation of a new heating and cooling air conditioning...
08/07/2026

Our Facilities Management team has successfully completed the installation of a new heating and cooling air conditioning system within the clubhouse offices at Dumbarnie Links Dumbarnie Golf Links

Recognised as one of Scotland's premier links golf courses, Dumbarnie Links is renowned for its outstanding facilities and spectacular coastal setting. We were delighted to support the team by delivering an upgraded climate control solution that will provide a comfortable working environment throughout the year.

The project was carefully planned to meet a tight programme, with the installation required to be completed within five working days ahead of the course reopening. Thanks to detailed planning and close collaboration with the Dumbarnie Links team, the project was completed on time and exactly as planned.

A big thank you to the team at Dumbarnie Links for the opportunity to work on such a fantastic facility and to our engineers for another high-quality project delivered.

Address

Campbell House, First Floor, Greenside Road
Glasgow

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+441236808499

Alerts

Be the first to know and let us send you an email when PREAH Building Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to PREAH Building Services:

Shortcuts

Share

Nearby engineering companies