New view building

New view building Welcome to New view building limited, a family run business with 25+ years experience.

🚨 Photo dump 🚨Our full house demolision and construction of new dwelling in Hayling island completed earlier this year. ...
10/11/2024

🚨 Photo dump 🚨

Our full house demolision and construction of new dwelling in Hayling island completed earlier this year.

This house was completed to a high specification and included

🌟 Full under floor heating
🌟 Air source hest pump
🌟Solar pv with battery back up
🌟 Mechanical ventilation & heat recovery unit (MVHR)
🌟 Extremely highly insulated throughout with full SAP calculations and air test submitted.
🌟 2 person lift to all 3 floors with full disability acess to all rooms
🌟 High efficiency aluminium window and door frames, triple glazing with sun cool glass to prevent overheating from the vast amount of glazing on the house.
🌟 Framless balustrades on all balcony areas for seamless views
🌟 Triple glazed flat roof skylights

The site was a challenging build as we filled the entire site to the boundary on almost 3 of the elevations with the new property.

Extremely proud with the final result and the workmanship of the team as usual.

As always all work completed by our in house team of tradesman.

Little project we have been working on in Hayling IslandFull renovation of a 3 bedroom property and single storey rear e...
26/07/2024

Little project we have been working on in Hayling Island

Full renovation of a 3 bedroom property and single storey rear extension including -

🧱 rear extension 🧱
⚡️ Full rewire ⚡️
🔧 new complete plumbing system🔧
🪟 replacement of all windows and doors 🪟
🪜house fully re plastered 🪜
🛠️ New kitchen 🛠️
🛀 New bathroom, w.c and En-suite addition 🛀
🔨 Removal of load bearing rear wall 🔨
🧹New flooring throughout 🧹
🪚 Replacement of all joinery 🪚
🖌️ complete decoration 🖌️

As always all work completed by our full time in house team. 💪🏼

Let us know what you think

Getting close now 😬  Finishing touches and decoration on our full new build house project on Hayling island.🪚 2nd fix ca...
01/04/2024

Getting close now 😬

Finishing touches and decoration on our full new build house project on Hayling island.

🪚 2nd fix carpentry almost complete 🪚

🚿 bathrooms getting fitted 🚿

✔️ Flooring down and protected ✔️

🖌️ Decorating underway 🖌️

⚒️ Kitchen fitted ready for quartz templating ⚒️

Few progress pics of our full house build project in hayling island. Full silicone brilliant white k-rend on ground and ...
08/03/2024

Few progress pics of our full house build project in hayling island.

Full silicone brilliant white k-rend on ground and 1st floor

Cedral composite cladding on 2nd floor

Triple glazed sliding doors

Full fibre glass roofs on main roof and balcony

Solar panels installed ready to connect to battery back up system.

Plastering almost complete

Internal finishes and landscaping next!

Old dated inefficient windows removed,Window openings altered to maximise the beautiful view and new high efficient comp...
06/03/2024

Old dated inefficient windows removed,
Window openings altered to maximise the beautiful view and new high efficient composite windows fitted on one of our projects in hayling island.

🏠 Full house reonvation, ground floor side extension and 1st floor front extension 🏠Some before and during progress pict...
24/02/2024

🏠 Full house reonvation, ground floor side extension and 1st floor front extension 🏠

Some before and during progress pictures of this project in hayling island.

🔨 Full strip out complete 🔨

🪜 New stair opening trimmed out and new stair case fitted. 🪜

⚒️ Ground floor wall removed and RSJ installed, all internal door openings and walls reconfigured ⚒️

🧱 Ground floor side extension built 🧱

🪚 1st floor front extension built, existing house wall removed and all rooms configured 🪚

⚡️ 1st fix electrical work under way ⚡️

🪠 1st fix plumbing nearing completion 🪠

As always all work completed by our in house very talented workforce 💪🏼

Some before and after photos of the loft conversion we have completed in hayling island.  We think it looks absolutely s...
31/01/2024

Some before and after photos of the loft conversion we have completed in hayling island.

We think it looks absolutely stunning and takes full advantage of the beautiful view of the Solent.

As always all work is completed by our full time talented team of tradesmen

New year, New house? 🏠 A few progress pictures of our new build dwelling on Hayling Island, whether it’s an extension, l...
01/01/2024

New year, New house? 🏠

A few progress pictures of our new build dwelling on Hayling Island, whether it’s an extension, loft conversion, complete New build or just some alterations, Our full time team at New View can complete it all for you.

On this build we are aiming for a high efficiency energy rating for our customer so we have all the latest materials to make it efficient as possible.

All 1st fix plumbing, electrical, mechanical ventilation heat recovery (MVHR) and under floor heating on all 3 floors completed.

Triple glazed aluminium windows and doors with suncool glass to prevent overheating in the summer as well as keeping the warm in during winter.

Insulation well over regulation standards to achieve higher efficiency.

New aritco compact elevator 🛗

Looking forward to the sliding patio doors coming in the next couple of weeks to fully appreciate how light and airy this house will be.

Sneak peak at our loft conversion project on hayling island seafront 🌊 Some snags and few outside finishes to go on this...
27/12/2023

Sneak peak at our loft conversion project on hayling island seafront 🌊

Some snags and few outside finishes to go on this this one and we will be done. ☑️

I think you’ll agree from the photos it is looking fantastic 🤩

As well as the loft conversion on this one, we have also removed the 1st floor walls and chimney providing a clear open plan kitchen/dining/living area with separate television snug room. 📺

As always all work completed in house by our full time talented team of tradesman. 🔨

All electrical work completed by Berewood Electrical as always ⚡️

All plumbing and boiler works completed by TLF Plumbing and Heating as always 🪠

⭐️New build in hayling⭐️✅final level of blockwork built up ✅1st floor steel work lifted in and bolted up. ✅2nd floor ste...
04/10/2023

⭐️New build in hayling⭐️

✅final level of blockwork built up
✅1st floor steel work lifted in and bolted up.
✅2nd floor steels lifted in by Danny Mears Transport Ltd
✅1st and 2nd floor joists trimmed out with engineered I-joists supplied by specialist
✅standard joists in all balcony areas

🪚timber frame construction for the 2nd floor next

As always all work completed by put in house talented full time workforce 💪🏼

Some impressive structural work completed at our roof extension job in hayling island. ☀️ 🌊 There is very few places tha...
12/09/2023

Some impressive structural work completed at our roof extension job in hayling island.

☀️ 🌊 There is very few places that are nicer to work at than here!

⭐️ Glulam ridge beam craned 🏗️ in place with cantilevered front section to form enclosed balcony
⭐️ Roof boarded with structural OSB 3 for integrity being so close to the sea.
⭐️All 1st fix electrics in on existing 1st floor and new 2nd floor
⭐️All 1st fix plumbing in for new 2nd floor and alterations on 1st floor

⚒️looking forward to commencing the finishing side of this project now.

As always all work completed by our full time talented workforce 💪🏼

Some lovely progress on our new build on hayling island. 7mn high density internal block work to carry all the loads of ...
06/09/2023

Some lovely progress on our new build on hayling island.

7mn high density internal block work to carry all the loads of the next 2 storeys built off our raft foundation.

New conventional joists going in on the back end of the build for the rear balcony’s overlooking the nature reserve and sea.

New engineered I-joists and cantilever steel work for the front section of the house going in the rest of this week 💪🏼

As always all work completed by our talented full time workforce 🛠️

Address

12 Fisher Road
Gosport
PO130JJ

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+447985519726

Website

Alerts

Be the first to know and let us send you an email when New view building posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share