21/10/2026
Another successful lift for LSS!
A challenging 4-ton pump lift carried out as part of an all-flow job, carefully lifting the pump through the doors and loading it onto our lorry, ready for transport.
Great teamwork, careful planning and precision lifting to get the job done safely and efficiently.
Get in touch with LSS Lifting for your lifting and lifting equipment requirements.