A short story of the transformation of this job. For more information please feel free to message!                      ...
18/01/2025

A short story of the transformation of this job. For more information please feel free to message! Would you want a kitchen like this?

So nearly there now. The last few handles to fit, kick boards and skirting and the last of the pelmet to install.       ...
17/01/2025

So nearly there now. The last few handles to fit, kick boards and skirting and the last of the pelmet to install.

14/11/2024

After a few weeks of hard work.
Including removing existing kitchen.
Removing walls.
Installing steels.
Building posts to support steels.
Swapping the window and door locations and making good.
Two new boilers installed
Plumbing and electrical installations.
Plasterboarding.
We now await underfloor heating installation and plastering. After these we will be able to begin to install a brand new kitchen for this client. Fully transforming this once two rooms into one big open plan kitchen diner.

If you are interested in following the progress of this job. Please like and follow my page and feel free to check out my other content for the steps we take to insure a quality and up to standard builds.

Window and door swap.Due to the kitchen design, We needed to install a brand new window and swap the door opening and wi...
13/11/2024

Window and door swap.
Due to the kitchen design, We needed to install a brand new window and swap the door opening and window opening with each other.
In this process we took out both window and door and bricked up the door opening to the new height for the window.
For the door we removed the necessary bricks and blocks installed the door and made good.

Steel installation. The two 6 meter steels are now in place and propped. We now prepare the padstones and piers for them...
05/11/2024

Steel installation.
The two 6 meter steels are now in place and propped.
We now prepare the padstones and piers for them to rest on. This is vital for weight distribution. This is done to regulations given by a structural engineer and checked by building control to insure the job has been done correctly.

Wall is down and cleared up. We are now doing our final preparations for the two six meter steels to be installed. We pr...
01/11/2024

Wall is down and cleared up. We are now doing our final preparations for the two six meter steels to be installed. We prepare by clearing the new area where the steel will be placed of any muck or debris. To make sure that the steel gets proper contact to support the house. We also drill both steels for bolts to connect them together and to the exiting plate of the single story roof to support and tie them together.

Demolition day!To begin we removed the existing kitchen and flooring we made some electrics safe and isolated parts of t...
31/10/2024

Demolition day!
To begin we removed the existing kitchen and flooring we made some electrics safe and isolated parts of the house for the short period of this work.
After alot of careful and precise supports installed to guarantee the structural integrity of the homes rear exterior walls and flooring above, We began removing the load bearing walls beneath.
Doing so we have opened up this living space increasing the comfort of the home in preparation of the kitchen and dining room.

A new job is underway while our colleagues finish up the previous extention and renovations kitchen.This job is a renova...
30/10/2024

A new job is underway while our colleagues finish up the previous extention and renovations kitchen.
This job is a renovation of the existing kitchen. We are knocking through to create a large kitchen and dining area with a central island to host or eat meals!
Keep a check to see the progress of this job!

From exposed floors and ceiling to all plastered and liquid screed poured. With second fix electrics done, This job is n...
29/10/2024

From exposed floors and ceiling to all plastered and liquid screed poured. With second fix electrics done, This job is now ready for kitchen installation and flooring!
Finished product coming soon! 🎉

Complete kitchen and utility room rebuild with a knock through to really open up the living space. Very proud on how thi...
28/10/2024

Complete kitchen and utility room rebuild with a knock through to really open up the living space.
Very proud on how this job came out. The clients are very very happy.

Address

Stoughton
Guildford
GU2

Telephone

+447399918839

Website

Alerts

Be the first to know and let us send you an email when TJH Brickwork, Extensions and Renovations. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to TJH Brickwork, Extensions and Renovations.:

Share