Now THAT is a garden transformation ππ₯
From a full lawn to a 40mΒ² low-maintenance composite deck and newly flagged area β completed in just 3 days.
This one wasn't without its challenges either. Access was extremely tight, meaning getting the digger and dumper in to remove a full load of muck took some careful workβ¦ but we love a challenge. πͺ
Once the levels were sorted, we got to work:
π¨ 40mΒ² composite decking installed on a solid 6x2 treated timber frame, with every board properly clipped at every joist β no shortcuts.
π§± 10mΒ² new flagged area, including a step to reduce the steep change in level and create a much better transition through the garden.
π Ground excavated, hardcore installed and compacted in layers to provide a solid base beneath the new paving.
π§Ήπ§ Everything finished with resin pointing, a full jet wash and complete clean-up before we left.
3 days. One completely different garden.
No more mowing. No more wasted lawn. Just a large, usable outdoor space that's low-maintenance and built to last.
Zack Patchett Groundworks & Fencing
Driveways β’ Fencing β’ Groundworks β’ Patios β’ Composite Decking
π Covering Yorkshire & surrounding areas
π© Thinking about changing your garden? Send us a message or a few photos for a free, no-obligation quote.
π 07706 202086