07/06/2026
The Groundworks360 team completed four CFA piled reinforced concrete slabs for four new warehouse units in Southampton. Concrete finish to all slabs is power floated. Setting out, CFA piling, Formwork, Steel fixing, holding down bolts, concrete placement and power float concrete finish.
👷🏼♂️Reinforced concrete works
👷🏼♂️CFA Piling and restricted access piling
👷🏼♂️Ground beams
👷🏼♂️Underpinning
👷🏼♂️Reinforced Concrete
👷🏼♂️Retaining Walls
👷🏼♂️Gabion wall Construction
👷🏼♂️Sea walls and Revetments
👷🏼♂️Storm water and Foul water drainage
👷🏼♂️Foundations and slabs
👷🏼♂️ Basement construction
www.groundworks360.co.uk [email protected]