14/05/2026
Do you think this detail is overkill? ๐๐จ
Hereโs an engineering detail weโve used within our joist frame that allows us to run the waste pipe outside of the standard drill zones โ while still maintaining the structural integrity and strength of the joist.
A lot of the best building work goes unnoticed once the plasterboard goes on, but itโs details like this that make the difference between โgetting it doneโ and building it properly.
Strong structure. Clean installation. No compromises.
Would you do it this way? ๐