Congratulations to The Erith Group Swanton Consulting Ltd Julian Malasi (and all other site management / subcontractors involved in this project).
Thank you for the opportunity for to demonstrate our expertises to complete the lifting of of 5 floor levels individually and combined per/level per operation to achieve total lift of approximately 3 metres - weighing/jacking force of 900 tonnes!! π―
Summary of works:
β‘οΈ Operation 1: Lifting roof level
β‘οΈ Operation 2: Lifting roof level + level 4
β‘οΈ Operation 3: Lifting roof level + level 4, and level 3
β‘οΈ Operation 4: Lifting roof level + level 4, level 3 and level 2
β‘οΈ Operation 3: Lifting roof level + level 4, level 3, level 2 and finally level 1
Each operation doubled in weight and involved complexity for accuracy required; within 1-2mm per floor level to ensure final lift was with overall parameters of 7mm π§
Using a combination of steelwork fabrication frames around existing columns, temporary propping to allow cutting free/supporting connections and a range of hydraulic cylinders (25, 30 and 50 tonnes capacity with 250mm upto 1000mm per/stroke cylinders)
Well done to everyone involved πππ
More details to follow