28/04/2026
New access point, fully finished 👷♂️🧱
We’ve created a new opening in the existing brickwork, reconfigured the surrounding block paving, and installed key clamp railings to complete the space safely and neatly.
From precise cutting and structural alterations to relaying the pavers and fitting the rail system, every detail was done to ensure it all ties in seamlessly — like it’s always been there. Internally we built a raised disabled access walkway to the shop floor creating a perfect entrance.
A clean, functional upgrade that improves both access and safety.
ConstructionLife SiteWork BeforeAndAfter AttentionToDetail BuildingBetter