J R Hilldrup Groundworks Ltd

J R Hilldrup Groundworks Ltd All aspects of Groundworks undertaken:
Foundations
Plant hire
Concreting
Kerbing
Drainage

13/06/2026
A few snaps of what we’ve been up to the last few weeks now the suns out! From digging out pools, digging out for new bu...
31/05/2026

A few snaps of what we’ve been up to the last few weeks now the suns out! From digging out pools, digging out for new buildings, roadways and culverts, concrete floors, service trenches, resin patio and abit of tarmac!

Kerbing, Acos, stoning up and getting the base layer down at Pool Yard development for .
26/04/2026

Kerbing, Acos, stoning up and getting the base layer down at Pool Yard development for .

⚠️sewerage treatment plant failure!⚠️ This old tank unfortunately decided to pop out the ground after being emptied and ...
19/04/2026

⚠️sewerage treatment plant failure!⚠️ This old tank unfortunately decided to pop out the ground after being emptied and a lot of rainfall! We removed old and replaced with a newer and bigger capacity treatment plant.

20/03/2026
We’ve had a busy few days pouring this concrete road!Thanks to  Then finished off with a tarmac driveway!
08/03/2026

We’ve had a busy few days pouring this concrete road!Thanks to Then finished off with a tarmac driveway!

Battling through the weather getting the  Kerbing done, stoning up and finally getting a base layer of tarmac down!     ...
15/02/2026

Battling through the weather getting the Kerbing done, stoning up and finally getting a base layer of tarmac down!

Blocks for days! Almost 6000 concrete blocks went into these footings and block and beam floor! All ready for the timber...
11/01/2026

Blocks for days! Almost 6000 concrete blocks went into these footings and block and beam floor! All ready for the timber frame

⚠️Demolition, crushing, Kerbing and tarmac entrance⚠️ Took down this steel building, broke up all concrete yard, crushed...
14/12/2025

⚠️Demolition, crushing, Kerbing and tarmac entrance⚠️ Took down this steel building, broke up all concrete yard, crushed all concrete and stock piled. Kerbed new access road, tarmacced entrance and stoned the rest.

The foundations have been dug out, luckily only a few bits of rock!,  building control happy and 126 cube of concrete la...
07/12/2025

The foundations have been dug out, luckily only a few bits of rock!, building control happy and 126 cube of concrete later we are ready for the blocks!