ATAC Solutions Ltd

Call Directions Website

ATAC Solutions Ltd We are a UK based company specialising in Wastewater Solutions and Wastewater management. We operate

We operate in the domestic, municipal and industrial markets.

Yesterday’s Yorkshire Water Mini Conference was a real success, with strong interest in ATAC’s products and solutions.We...
22/10/2026

Yesterday’s Yorkshire Water Mini Conference was a real success, with strong interest in ATAC’s products and solutions.

We were next to our sister company, Hydro International. Both ATAC and Hydro International are part of CRH, so under one family we can offer a wider spectrum of products and more complete solutions for our customers, a real benefit for the end user.

We will follow up every enquiry we received at the conference and will be in touch very soon. Thank you for your ongoing interest in ATAC.

Contact our team today:
πŸ’» [email protected]
πŸ“² 01622 882400
🌐 https://atacsolutions.com/contact-us/

The ATAC team is at Yorkshire Water Mini Conference at The Weetwood Hall in Leeds now with The Pump Centre. If you are h...
21/10/2026

The ATAC team is at Yorkshire Water Mini Conference at The Weetwood Hall in Leeds now with The Pump Centre. If you are here, come and say hello. If you are not, this is what we are talking about on the stand: modular, scalable wastewater treatment plants; tighter consents; and how to keep AMP8 programmes moving when lead times and site time are tight.

Bring the site you are stuck on. We will talk it through.

Michael Orchard, Glyn Cann and ZoΓ« Matthews are here on the ATAC stand.

Get in touch:
πŸ’» [email protected]
πŸ“² 01622 882400
🌐 https://atacsolutions.com/contact-us/

Tomorrow, ATAC team will be at the Yorkshire Water Mini Conference. Hosted by Pump Centre at The Weetwood Hall, Leeds. C...
20/10/2026

Tomorrow, ATAC team will be at the Yorkshire Water Mini Conference. Hosted by Pump Centre at The Weetwood Hall, Leeds. Come and find us!

We are happy to talk through major wastewater infrastructure upgrades and how to stay ahead of ever tighter regulatory expectations.

Come and talk to us about:
-MITA Water Technologies Pile Cloth Filters and tertiary treatment for tightening TSS and phosphorus consents
-SAF, vSAF, MBBR and Anoxic MBBR biological treatment, available for capital purchase or hire
-Lamella settlement, coagulation and full phosphorus removal schemes
-Our Build-to-Buy scheme, with stainless steel tanks and filters built in advance so they are ready when your programme needs them
-RBC to MBBR retrofit. A new service ATAC is bringing to the UK market from its sister company in Canada, Nexom.

With AMP8 delivery gathering pace across the UK water sector, lead times and flexibility matter more than ever. Bring your site challenges and we will talk through the options with you.

Interested? Connect via our Contact Us form, or drop us a message:

Contact our team today:
πŸ’» [email protected]
πŸ“² 01622 882400
🌐 https://atacsolutions.com/contact-us/

Today our ATAC team is marking Baby Loss Awareness Week with a simple act of support.This week is a chance to remember m...
16/10/2026

Today our ATAC team is marking Baby Loss Awareness Week with a simple act of support.

This week is a chance to remember much-loved and missed babies, stand with bereaved families, and help break the silence around pregnancy and baby loss.

Colleagues are wearing blue or pink as a visible sign of remembrance.

At 1:00pm we shared a pizza lunch, and instead of charging for it we are asking anyone who can to make a donation of their choosing. Every contribution, whatever the size, helps charities keep supporting people and families affected by pregnancy and baby loss.

You can find out more, and donate, via Baby Loss Awareness Week and Sands: https://www.babyloss-awareness.org/

Thank you to everyone taking part, whether by wearing blue or pink, joining the lunch, or donating.

Tighter consents, ageing plant, less time on site, tighter budgets and influent that will not sit still. If that is what...
08/10/2026

Tighter consents, ageing plant, less time on site, tighter budgets and influent that will not sit still. If that is what you are carrying into this AMP, come and talk it through with the ATAC team.

We are exhibiting at the Yorkshire Water Mini Conference on 21 October. The Pump Centre is hosting the day at The Weetwood Hall, Leeds.

On the stand you will see our modular, scalable, deployable wastewater treatment plants, manufactured off site and delivered ready to install. Less work on site and fewer interfaces. Factory-built quality, a consistent design and easier commissioning. Time back on the programme, fewer health and safety incidents, and lower embodied carbon.

Bring the site you are stuck on. We will work through it with you.

Contact our team today:
πŸ’» [email protected]
πŸ“² 01622 882400
🌐 https://atacsolutions.com/contact-us/

ATAC has successfully completed another aeration lane refurbishment. Working with our client, we have finished a full re...
07/10/2026

ATAC has successfully completed another aeration lane refurbishment. Working with our client, we have finished a full replacement of the low-level pipework and 936 nine-inch aeration membranes on Aeration Lane 5 at a Sewage Treatment Works in Hertfordshire, the first of two lanes, with Lane 7 to follow.

Taking the lanes one at a time keeps the works in service. Delivered as Principal Contractor and Principal Designer under , our team managed site coordination, confined space operations, welfare, safety and project ex*****on throughout.

Works completed across Lane 5:
-Removal and disposal of all existing low-level aeration pipework
-Lane cleaning to remove settled sludge and grit, carried out by confined space teams
-Multiple scaffold access points for safe access and egress to all parts of the lane
-Aeration integrity checks, reintroduction of flow and air, and pattern testing to verify coverage
-Recommissioning and handback to site operations

Lane 5 is back in service and attention now turns to Lane 7.

Cleaner, safer waterways are the point of all of this. It is what the Axius Water mission is built around, and what means on the ground. We're here to help keep your site compliant, efficient, and future-ready.

Contact our team today:

πŸ“ ATAC Solutions Ltd HQ
πŸ’» [email protected]
πŸ“² 01622 882400
🌐 https://atacsolutions.com/contact-us/

πŸ“ South West, UK
Michael Orchard
πŸ’» [email protected]
πŸ“² +44 787 377 7541
🌐 https://atacsolutions.com/contact-us/

πŸ“ North and Midlands, UK
ZoΓ« Matthews
πŸ’» [email protected]
πŸ“² +44 756 129 4821
🌐 https://atacsolutions.com/contact-us/

Glyn Cann
βœ‰οΈ [email protected]
πŸ“² +44 7561 294822
🌐 https://atacsolutions.com/contact-us/

Thank you to everyone who took part in Friday's Macmillan Cancer Support Coffee Morning at ATAC. We raised Β£184.20 for M...
28/09/2026

Thank you to everyone who took part in Friday's Macmillan Cancer Support Coffee Morning at ATAC. We raised Β£184.20 for Macmillan! It makes us proud to work somewhere where people are so generous with their time, their baking and their donations.

The best bake competition was closely fought:
1st: Jessica Hodson, fudge bites
2nd: Aggie Suleyman, apple cake
3rd: Evie, shortbread

Well done to our winners, and to everyone who filled the tables. If you would still like to donate: https://coffee.macmillan.org.uk/

ATAC is hosting our Macmillan Cancer Support Coffee Morning, something we look forward to every year. The tables are ful...
25/09/2026

ATAC is hosting our Macmillan Cancer Support Coffee Morning, something we look forward to every year. The tables are full, the baking standard is high, and the friendly competition among colleagues is well under way.

Our team never disappoints. Bhajis, apple pie, cupcakes, sausage rolls, you name it. The real point, of course, is Macmillan Cancer Support, and the difference a morning like this makes.

If you would like to donate, or to join us for a cuppa while the judging is still going: https://cm26.macmillan.org.uk/fundraising/cm26000861

The first aeration lane of the ASP re-doming works at STW site in Buckinghamshire is finished and back in service.The wi...
24/09/2026

The first aeration lane of the ASP re-doming works at STW site in Buckinghamshire is finished and back in service.
The wider scheme covers two mirror-image ASP plants, each with two aeration lanes, and the replacement of 7,150 nine-inch fine bubble diffusers, with inspection of drop legs, manifolds and pipework. The existing diffusers were last replaced in 2015/2016 and had reached the end of their asset life, with failures showing up in recent inspections.

On Lane 1 our team has:

-Installed flow isolation boards to hold the lane dry and prevent effluent re-entry from the adjacent lanes, with over-pumping and filtration to the interstage pumping station during draining

-Cleaned out the lane and removed grit, rag and sludge arisings, using a grit plant to separate solids before disposal to licensed facilities

-Completed the 1,784 diffuser membrane replacement, with drop legs, manifolds and pipework inspected and made good as required

-Worked throughout under confined space controls, with scaffolded access and safe egress in place for the duration of the outage

-The lane was pattern tested. Air flow balancing was completed lane by lane.

Since commissioning on 28 July 2026, the refurbished lane has already removed:
- 79,832 kg of BOD
- 15,718 kg of ammonia (NH₃)

Restoring aeration performance on a live works takes careful sequencing around isolations, outages and everything else happening on site. Thanks to the site team for the coordination that made it possible. Attention now turns to the remaining lanes.

If you have ageing diffuser assets and want to talk through re-doming or drop-in grid options, get in touch:

πŸ“ ATAC Solutions Ltd HQ
πŸ’» [email protected]
πŸ“² 01622 882400
🌐 https://atacsolutions.com/contact-us/

πŸ“ South West, UK - Michael Orchard
πŸ’» [email protected]
πŸ“² +44 787 377 7541
🌐 https://atacsolutions.com/contact-us/

πŸ“ North and Midlands, UK - ZoΓ« Matthews
πŸ’» [email protected]
πŸ“² +44 756 129 4821
🌐 https://atacsolutions.com/contact-us/

Our Senior Project Engineer, James Topham, spent 32 weeks preparing for Ironman Nice. He got there, only to hear the eve...
23/09/2026

Our Senior Project Engineer, James Topham, spent 32 weeks preparing for Ironman Nice. He got there, only to hear the event had been cancelled because of abnormally hot weather.

Disappointed, of course. Health and safety comes first, though, and James, like many of the other athletes, took the news with good grace and came home.

That work was not going to waste. James recently completed the 2026 Vitruvian triathlon at Rutland Water:

-Swim: 1.9 km (1.2 miles), two laps in the sheltered open water of Whitwell Creek

-Bike: 89 km (55 miles), three fast laps on open roads, largely flat or undulating around the reservoir

-Run: 21 km (13.1 miles), two scenic laps on flat tarmac along the shoreline

Finish time: 5 hours 50 minutes 32 seconds.

It takes a strong body and a stronger mind to turn a cancelled Ironman into a result like that. Congratulations! We are so proud of you, James. Well done from all of us.

Address

Unit A9 LOC 8 Business Park Ashford Road Hollingbourne
Hollingbourne
ME171WR

Alerts

Be the first to know and let us send you an email when ATAC Solutions Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share