HCS completed this general arrangement drawing of a stylish car port for a Contractor to satisfy Building Control and to coordinate the oak frame structure with the structural foundations and wall for the oak frame to sit on.
This project highlighted the importance of ensuring that all required stakeholders are involved at the correct times during the course of a project, ensuring that all relavent sign offs are in place prior to construction. Producing retrospective documentation or drawings to satisfy planning or building control quiries is not an ideal position to be in and HCS will always work with Clients to avoid these types of scenarios.
In this projects instances, following HCS involvement building control were satisfied, the builder was reassured, as was the property owner.