06/12/2024
Phase 1 done on this big project. Usually I work my way back to the plantroom. However on this project the client is living in the property throughout a 18month renovation. This means I need to maintain heat and hot water. Over the period of time. I will need to break into different aspects of the existing system at different times. Completing one side of this house first then moving into the other whilst keeping both sides of the house alive 🤪. These are the sort of jobs where you can come unstuck on your pricing. The extra days turn into weeks and before you know it you’re out of pocket. I’ve learned the hard way with this in the past. Buy the only way we learn is through experience and sometimes failure. If you don’t learn and grow from the failure and become better then you’re approaching this game wrong. Theres reasons behind this system design I will explain more in posts surrounding this job down the line.