LPH Developments

LPH Developments We are a company based in Ipswich. The works we carry out are extensions, and general building works LPH developments was established in 2012 by Lee Holland.

LPH Development was setup and is run by Lee Holland who overseas all the projects on site. Lee will undertake the meetings from start to finish with the client and discuss all areas of the project. Lee himself is a highly skilled worker and has alot of knowledge in the construction industry. Lee started as a joiner/carpenter, which he gained qualifications in level 2 and 3. With moving on with his

career through the construction industry he was lucky to get the chance to help out a smaller company that was up and coming. Which lead him back to college again, which he achieved top qualification levels in brick and block work and with this becoming a site manager within this company. With over the years he's been able to add plastering and plumbing to the list of skills, also through his career in construction has gained his level 6's in site management and building inspection with all this knowledge lee then decided it was time to start a new challenge in his career to setup and start his own company. our portfolio has a huge array of different projects from internal and external alterations, garden projects to complete extensions projects, to which all are treated to the same high quality service. We also sub-contract to other construction companies that need skilled workers for there projects.

Had a good week inside to so all electrics poked up in to the loft we put a little chase at each end off the room to see...
23/03/2024

Had a good week inside to so all electrics poked up in to the loft we put a little chase at each end off the room to see exactly where are rafters are then pinged a caulk line on ceiling for a screws when we over board and all prep work done and ready for plastering. The ceiling area was too big for me to do so called in Calvin Fairs Plastering to do the hard work for me and they done a great job so thank you for that. 

So been a good week. We got all the prep work finished and roof light on ready for roofers, now we are weather tight on ...
23/03/2024

So been a good week. We got all the prep work finished and roof light on ready for roofers, now we are weather tight on the extension and garage roof all thanks to Newbury roofing ltd. And scaffold came down Friday to thanks to R.Crick&Co Scaffolding Ltd for the scaffold on this job. Great work from all.

And yesterday we went indoors to start the internal part of the existing while the clients were out.Once again getting c...
16/03/2024

And yesterday we went indoors to start the internal part of the existing while the clients were out.
Once again getting carried away with what we had to get done forgot to get the full photos video of before we started the demolition, o well 😂. But here you go so photos when I remembered to take photos to the finished result of are work for a Friday. And to top off the a photos of a rainbow we got at the end of are day. All work done by Lee Holland Adib Badshaw . From us have a great weekend all. 

Second and final part be the roof forming. So to keep the fascia hight down we fixed another timber section on top of ar...
16/03/2024

Second and final part be the roof forming. So to keep the fascia hight down we fixed another timber section on top of are osb using 6x2 the thickness of are celotex 150mm. Used 300mm screws to tie in to the below rafters. Once all in and taped we fitted 18mm ply which had 300mm fixings to fix through to connect to the below rafters. Verges in on the existing roof and fitted timbers on are flat roof and fascia and around roof light for the roofers. The covering should be down this week coming. All work done by Lee Holland Adib Badshaw

Wall plate fitted and first phase of the roof structure going up. We have a roof light going in to this extension to so ...
16/03/2024

Wall plate fitted and first phase of the roof structure going up. We have a roof light going in to this extension to so had to double up rafters where it will be sitting. We blacked the ends off are 6x2 rafters as they are within are cavity. Furring pieces fitted what give us are 1:40 fall and then 18mm osb on top now ready for the second phase of the roof structure. All work done by Lee Holland Adib Badshaw

So blinding down DPM down and the concrete slab poured in. DPC high in and block and brick work going up to plate hight ...
16/03/2024

So blinding down DPM down and the concrete slab poured in. DPC high in and block and brick work going up to plate hight 150mm cavity. Now ready for plate and flat roof rafters to go in. All work done by Lee Holland Adib Badshaw

Been getting a lot of friends, family and followers asking and wondering what we are doing as I haven’t posted for a whi...
16/03/2024

Been getting a lot of friends, family and followers asking and wondering what we are doing as I haven’t posted for a while. We had a lot going on with work and the weather has not been kind to us start of this year. But Photos and updates of what we are doing and up to on projects will start coming in.
So this selection of photos on the we are on, the foundation poured the new position of waste in and stoned. The garage wall cut to position and wind post fitted to the new found and existing garage wall. The oversite built up and type1 in and wacked. And new pipe run for the rain water down Side of the extension. All work done by Lee Holland Adib Badshaw

10/02/2024

Highly recommend

So this week we started are next project in melton an extension at the back of this bungalow and alterations with walls ...
10/02/2024

So this week we started are next project in melton an extension at the back of this bungalow and alterations with walls coming down in the existing to change the floor layout of the bungalow and making good.
So extension and footing have been marked out and dug down to expose the existing foundations had fun in this dig as exposed to live drain runs and the main electric feed to the bungalow what fun that was digging by hand 🫣😂. Foundation has been poured and ready for us next week to start the next phase of the build. Turn your house into your home.

29/01/2024

Got some great news this morning in are emails we just won are second extension for 2024. So happy with all the hard work I put in to them being rewarded with the project to turn their house into their home. 🏡

Nice little job done all new doors with new ironmongery, then a panel system on the bottom part of the wall under the ex...
24/01/2024

Nice little job done all new doors with new ironmongery, then a panel system on the bottom part of the wall under the existing dado rail. Another happy customer and not just saying that as the client is my cousin lol. She’s going be busy this weekend as there a lot of painting to do the whole hallway is being freshened up with a new colour style can’t wait to see once completed. Thanks for having me.

This is why I do what I do. It’s never been about the money for me it’s about showing off are skills of what qualified b...
16/01/2024

This is why I do what I do. It’s never been about the money for me it’s about showing off are skills of what qualified builders can and will deliver to are clients with putting in 110% every day on every job we do. Thank you.

Address

Ipswich

Opening Hours

Monday 8am - 6pm
Tuesday 8am - 6pm
Wednesday 8am - 6pm
Thursday 8am - 6pm
Friday 8am - 6pm
Saturday 8am - 12pm

Telephone

+447809208751

Website

Alerts

Be the first to know and let us send you an email when LPH Developments posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to LPH Developments:

Share