Total Surfaces Ltd

Total Surfaces Ltd Supply and install of: Block paving- Paving- Natural Stone- Tarmac- Resin- Rubber Crumb
Groundwork contractor- Supply or Labour only
Council approved

20/09/2021

Flying the blocks down today

On to the next one.....watch this space.Already completed porcelain paving and resin footpaths.Back to resin bound drive...
22/08/2021

On to the next one.....watch this space.
Already completed porcelain paving and resin footpaths.
Back to resin bound driveway then block pave shared driveway

More pic's of the hessle job.Dig off tired driveway.Block paved nr the house and at the entrance. Binder course and 6mm ...
22/08/2021

More pic's of the hessle job.
Dig off tired driveway.
Block paved nr the house and at the entrance.
Binder course and 6mm SMA
Massive transformation for a longlasting driveway

Before and after,  resurfacing to tired driveway in Hessle
22/08/2021

Before and after, resurfacing to tired driveway in Hessle

Resin drive and drop crossing completed in Beverley
22/08/2021

Resin drive and drop crossing completed in Beverley

Resin bound job completed in Swanland for Propave Groundwork Services Ltd
16/08/2021

Resin bound job completed in Swanland for Propave Groundwork Services Ltd

Kingswood academy, start to finish
12/08/2021

Kingswood academy, start to finish

Before and after, Kingswood academy, nice job completed in a quick turnaround
12/08/2021

Before and after, Kingswood academy, nice job completed in a quick turnaround

Castle hill hospital footpath completed to entrance 3
03/08/2021

Castle hill hospital footpath completed to entrance 3

Tweed Grove drop crossing completed
29/07/2021

Tweed Grove drop crossing completed

Hand-laid binder course to 2 driveways, about 300m2 in this heat, more to be going at.....
22/07/2021

Hand-laid binder course to 2 driveways, about 300m2 in this heat, more to be going at.....

Drop crossing finally completed in Withernsea after discovering about 20 fibre-optic cables 75mm below the grass verge. ...
20/07/2021

Drop crossing finally completed in Withernsea after discovering about 20 fibre-optic cables 75mm below the grass verge.
KC's job to lower them

Address

Westerngailes Way
Kingston Upon Hull
HU89EQ

Alerts

Be the first to know and let us send you an email when Total Surfaces Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share