It’s been a busy 8 days doing the internals of this 2 bedroom house🔥🔨
First we insulated the kit panels then on with a vapour control layer followed by 15 mm gypsum sheets we used moisture boards in the bathrooms and kitchen areas we also fitted a double winder staircase in the roughing stage of this one as well.