14/10/2026
Final finish on our flood prevention drainage system
Our customer had 3 floods were heavy rain and failed existing drains can’t cope
We have redirected the water from front to back with a 150mm ground pipe and 150mm aco drain taped into it with 100mm standard aco as secondary
Fully reinstated blockpave concrete filling and a clean up