D L Jones Construction ltd

D L Jones Construction ltd Groundworks and building services

A few weeks of battons and boards, now finally ready for skim
07/12/2022

A few weeks of battons and boards, now finally ready for skim

A welcome change today with a bit of landscaping just to freshen thing up a bit
11/10/2022

A welcome change today with a bit of landscaping just to freshen thing up a bit

A few walls getting removed for change in layout
10/10/2022

A few walls getting removed for change in layout

A new piller built to help support a loose wall and existing pillar will be taken away for a bigger opening
10/10/2022

A new piller built to help support a loose wall and existing pillar will be taken away for a bigger opening

A full bathroom refurb including wet room shower, with all pipes hidden and fully waterproofed walls and floors
09/10/2022

A full bathroom refurb including wet room shower, with all pipes hidden and fully waterproofed walls and floors

Lots of time on the jackhammer getting ready for damproofing and wall repairs
09/10/2022

Lots of time on the jackhammer getting ready for damproofing and wall repairs

Recent extention done with a doorway knocked through 500mm of stonework 🥵
09/10/2022

Recent extention done with a doorway knocked through 500mm of stonework 🥵

Helping out doing a driveway/path in Hengoed for Velta construction while some of the guys are on holiday
30/07/2022

Helping out doing a driveway/path in Hengoed for Velta construction while some of the guys are on holiday

At last the weather was just right for the 2nd pour! Just over 30m3 in total
29/07/2022

At last the weather was just right for the 2nd pour! Just over 30m3 in total

A  property that needed the energy rating improved, 50mm insulation in the stud walls brought it to a C rating
25/07/2022

A property that needed the energy rating improved, 50mm insulation in the stud walls brought it to a C rating

An awkward dig to get done before the concrete, but finally going up
25/07/2022

An awkward dig to get done before the concrete, but finally going up

Some recent tiling work completed, ready for the bathroom suite
25/07/2022

Some recent tiling work completed, ready for the bathroom suite

Address

Llanelli
SA146

Website

Alerts

Be the first to know and let us send you an email when D L Jones Construction ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share