07/02/2026
Todays job was to carry out 2 freezes in a 1 pipe system to carry out some pipework modifications to allow the building works to take place.
We frooze either end, incorporating new valves, then piped up the new run adding an extra radiator!
42mm gerberit press for the win making the job effortless! The heating system is back up and running, it was like we was never there! Massive thanks to the lads today put a real shift in and didn't stop!
And to top it off a lovely 2 nil win for yanited!