Hallson Ltd

Hallson Ltd Hallson Ltd is a manufacturer of free standing and transformer mounted feeder pillars as well as indoor LV switchboards.

Hallson Ltd manufacture Low Voltage switchgear up to 690VAC. Our range of equipment include switchboards to Form 4 type 6. Outdoor free standing and transformer mounted feeder pillars.

Final switchboard of a 5 switchboard project destined for the middle of London. This one is a UPS bypass panel with auto...
09/02/2026

Final switchboard of a 5 switchboard project destined for the middle of London. This one is a UPS bypass panel with automatic change over and metering with full TCO/IP Gateway connection to BMS. Castelll interlocking between devices and the UPS to ensure continuous supply during UPS load testing.
Need a switchboard for your project? Give us a call.

One of a pair of transformer mounted ACB pillars with G99 operation @ 690VAC. These units are complete with their own 69...
05/12/2025

One of a pair of transformer mounted ACB pillars with G99 operation @ 690VAC. These units are complete with their own 690V VT and automatic operation on G99.
Need a solution for your green energy project? Give us a try.

Whilst a lot of people are enjoying their well earned holidays sites still need supplying with switchboards. Our guys ha...
11/08/2025

Whilst a lot of people are enjoying their well earned holidays sites still need supplying with switchboards. Our guys have been busy getting more equipment built up and out of the door.
These switchboards are for an important UK government research organisation.
We are seeing a lot of demand for devices with Micrologic 5 trip units. Primarily for discrimination along with metering. Did you know that the Micrologic 5 trip unit has its own power meter? Why not use it and bring device position and asset maintenance information to the table as well? Data is king for customers. Why not use it? Connect the whole system to the BMS via PAS Ethernet gateways via TCP/IP.


Another couple of BESS sites ready for despatch. This time a pair of transformer connected 2500A pillars with incoming A...
02/12/2024

Another couple of BESS sites ready for despatch. This time a pair of transformer connected 2500A pillars with incoming ACB, multi function meter, outgoing devices and all OF & SDE contacts wired to terminals. In addition to 7 400A pillars each with outgoing devices with status monitoring and incoming device interlocking for generator connection via plug in sockets.
Wait for the New Year with an even larger project in which we will reveal a new way of monitoring, going to be quite a change.


A PrismaSeT switchboard ready to be delivered and installed for our customer. Double incoming transformer supplies with ...
31/10/2024

A PrismaSeT switchboard ready to be delivered and installed for our customer. Double incoming transformer supplies with bus section. Outgoing devices including a TransferPacT Active automatic transfer switch for a critical supply.
How big do you think we can go with PrismaSeT? We don’t know, why don’t you try us?



Keeping home deliveries powered up. A transformer connected feeder pillar of to one of the world’s largest on-line retai...
02/10/2024

Keeping home deliveries powered up. A transformer connected feeder pillar of to one of the world’s largest on-line retailers. Destined to keep their ever increasing fleet of delivery vans charged up.
Transformer connected with outgoing devices, incoming device Ronis inter-locked with a generator connection point (fully rated) and battery charger for tilt switch DC control.



Another project of 2 PrismaSeT switchboards ready to go to site with our engineers this time to Edinburgh. Mains switchb...
19/09/2024

Another project of 2 PrismaSeT switchboards ready to go to site with our engineers this time to Edinburgh.
Mains switchboard with Schneider metering and an Essential Switchboard with a 400A TransferPacT Active automatic change over switch.
All documentation as ever available from the cloud 24/7 via QR code attached to the front of every panel.



BESS sites seem to be the flavour of the month this month.A TMM1600/10 + GCP transformer connected pillar ready to go to...
21/08/2024

BESS sites seem to be the flavour of the month this month.
A TMM1600/10 + GCP transformer connected pillar ready to go to site. Incoming ACB 4P with Ronis locking to quick connection and phase interlocked to ensure safe connection.
We are seeing more and more of these units as they give quick easy connection of a generator in the event of a failure or isolation of the transformer supply.



Unlike the England team our team don’t struggle to get the job over the line😂.Another TMM transformer connected feeder p...
26/06/2024

Unlike the England team our team don’t struggle to get the job over the line😂.
Another TMM transformer connected feeder pillar ready to go out the door to an industrial sector customer. Keep them coming…



Address

Loughborough
LE115GX

Opening Hours

Monday 8:30am - 5:30pm
Tuesday 8:30am - 5:30pm
Wednesday 8:30am - 5:30pm
Thursday 8:30am - 5:30pm
Friday 8:30am - 3pm

Telephone

+441509211330

Alerts

Be the first to know and let us send you an email when Hallson Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Hallson Ltd:

Share