14/09/2026
We had to scroll a long way back in the photo album for these before pics 🤣
It’s crazy looking back at where we started with this renovation project.
We took these before pictures in January 2025 when we started phase one.
Now we’re nearing the end of phase 2 over a year and a half later and we are proud of what’s been done here!
As you can see the property is pretty big and we can’t fit all the before and afters in one post so we’re starting with the outside of the property and we’ll be sharing more so keep a look out 👀
Here’s a run down of the work we did outside:
• Roof remodel to extend the existing loft space allowing for an entertainment space (with a pool table) with fully extending roof light
• Roof fully re-tiled and solar panels installed
• Existing render removed and re-done
• 3 of the 4 chimneys removed
• Brand new windows and doors fitted 155 in total 😱
• Repointing to bring the existing plinth and surround masonry back to life as well as a refresh to the remaining chimney
As always a big thanks to all the team, subcontractors and suppliers who helped us make it what it is today!