02/01/2024
A unit we did for a customer in Chesterfield. We first excavated and built a concrete shuttered retaining wall to retain the ground before pouring the bases and erecting the building. The building consists of Offices, toilets,canteen, work shop and conference room. A power-floated slab was poured throughout and the block work was all spray painted.