30/05/2026
Wow, what a scorcher of a week it’s been! We hope everyone has been keeping hydrated. ☀️💧
Since our last update, the building has really started to take shape.
A big thank you to Ace Welding for turning our posts around so quickly. Getting these fabricated promptly allowed us to keep moving, as they are built into the inner blockwork skin and will support the steelwork for the roof and lintel.
We managed to get the brickwork up to damp course level and install the block-and-beam floor. Thankfully, access to the site was good because those beams are incredibly heavy, along with the packs of concrete blocks that followed. Before long, we had a floor in place, giving the customer a real sense of the room’s size and layout.
Once everything had been signed off by Building Control, we cracked on with the brickwork and blockwork. It’s always a great feeling seeing a client’s excitement as their project starts to come to life in front of them.
Just a few more courses to go and we’ll be at lintel height. We’re hoping our steel beams will be back from the galvanisers next week,fingers crossed! 🤞
As always, a huge thank you to our suppliers for keeping us going. We couldn’t do what we do without your continued support.