07/09/2026
109m² resurfaced following an emergency repair.
After a Thames Water pipe burst, our team was on site to get the carriageway back to standard.
We removed the damaged surface at 110mm then laid AC 20 binder course at 70mm. Following that, we laid SMA 10 surface course at 40mm. To finish off, we re-lined the carriageway.
As always, delivered to a tight schedule with no compromise on quality.