🚧 Another challenging drainage install completed by the Drainflo team at the Big Climbing Depot in Wythenshawe 🚧
Working inside a 100+ year old building definitely brought its challenges on this one. With restricted access, tight working areas between steelwork, and existing concrete slabs reaching up to 700mm thick in places, this project tested the team from start to finish.
Our works included:
✔️ Internal concrete breakout
✔️ Excavation and installation of new below ground drainage
✔️ New inspection chambers and pipework connections
✔️ Working around existing structural steelwork and confined areas
✔️ Full concrete reinstatement works
Despite the difficult conditions, the Drainflo team pushed through and kept the project moving safely and efficiently throughout. 💪
No matter how tight the access or how tough the concrete, there’s not much that stops the team getting the job done.