BK Electrical

Call Directions

BK Electrical Reliable and High Quality Electrical Services provided for all Commercial & Domestic Installations.

Give us a call on 07500 047499 or email [email protected] for a free quotation

First time installing a Hager Hybrid TPN 20+2 Way Panel Board. Overcurrent Protection was needed for 3 Single Phase dist...
13/10/2026

First time installing a Hager Hybrid TPN 20+2 Way Panel Board.

Overcurrent Protection was needed for 3 Single Phase distribution circuits previously connected direct from main fuses.

Hager is our trusted brand when it comes to Distribution Boards & Panel Boards.

Overnight work completed by BK Electrical to ensure no disruption to business operation.

πŸ”΅ Electrical Contractors
πŸ”΅ Commercial & Domestic Installations
πŸ”΅ Electrical Installation Condition Reports
πŸ”΅ LED Lighting Upgrades
πŸ”΅ Emergency Lighting
πŸ”΅ EV Charger Installations
πŸ”΅ Partial & Full Re-Wires
πŸ”΅ PAT Testing
πŸ”΅ Call-outs & Emergency Call-outs

πŸ”΅Get In Touch For a FREE Quotation
πŸ”΅ [email protected]
πŸ”΅ 07500047499

Installing 10 new Bollard lights for a new Development on site. -SWAs glanded, keeping armouring earthed throughout circ...
24/09/2026

Installing 10 new Bollard lights for a new Development on site.

-SWAs glanded, keeping armouring earthed throughout circuit.
-M8 anchor bolts for secure fixing.
-Wiska 308 junction boxes used as appropriate enclosure.

Lights switched on photocell for residents throughout the night.

πŸ”΅ Electrical Contractors
πŸ”΅ Commercial & Domestic Installations
πŸ”΅ Electrical Installation Condition Reports
πŸ”΅ LED Lighting Upgrades
πŸ”΅ Emergency Lighting
πŸ”΅ EV Charger Installations
πŸ”΅ Partial & Full Re-Wires
πŸ”΅ PAT Testing
πŸ”΅ Call-outs & Emergency Call-outs

πŸ”΅Get In Touch For a FREE Quotation
πŸ”΅ [email protected]
πŸ”΅ 07500047499

Safe removal of x2 Distribution Boards with Asbestos Flash-guards this week.New 18th Edition Single Phase replacement wi...
11/09/2026

Safe removal of x2 Distribution Boards with Asbestos Flash-guards this week.

New 18th Edition Single Phase replacement with Surge Protection & RCBOs where required.

πŸ”΅ Electrical Contractors
πŸ”΅ Commercial & Domestic Installations
πŸ”΅ Electrical Installation Condition Reports
πŸ”΅ LED Lighting Upgrades
πŸ”΅ Emergency Lighting
πŸ”΅ EV Charger Installations
πŸ”΅ Partial & Full Re-Wires
πŸ”΅ PAT Testing
πŸ”΅ Call-outs & Emergency Call-outs

πŸ”΅Get In Touch For a FREE Quotation
πŸ”΅ [email protected]
πŸ”΅ 07500047499

New 63A TPN Supply installed with 4 Way Distribution Board with Surge Protection. Appropriate IP rated enclosure. Eassee...
02/09/2026

New 63A TPN Supply installed with 4 Way Distribution Board with Surge Protection. Appropriate IP rated enclosure.

Eassee 7kW EV Chargers x4 mounted on 2 way pedestals. Top quality product from Eassee for both installer & customer.

πŸ”΅ Electrical Contractors
πŸ”΅ Commercial & Domestic Installations
πŸ”΅ Electrical Installation Condition Reports
πŸ”΅ LED Lighting Upgrades
πŸ”΅ Emergency Lighting
πŸ”΅ EV Charger Installations
πŸ”΅ Partial & Full Re-Wires
πŸ”΅ PAT Testing
πŸ”΅ Call-outs & Emergency Call-outs

πŸ”΅Get In Touch For a FREE Quotation
πŸ”΅ [email protected]
πŸ”΅ 07500047499

8 Additional 13A Double Sockets on this installation during a busy week. 10M Electric Scissor Lift used for access. Low ...
14/08/2026

8 Additional 13A Double Sockets on this installation during a busy week.
10M Electric Scissor Lift used for access.
Low Smoke and Fume cabling used, metal clad double sockets, metal cable ties/metal saddles for 25mm conduit - all appropriate for the commercial environment.

Tested, certificated & complaint as always @ BK Electrical.

πŸ”΅ Electrical Contractors
πŸ”΅ Commercial & Domestic Installations
πŸ”΅ Electrical Installation Condition Reports
πŸ”΅ LED Lighting Upgrades
πŸ”΅ Emergency Lighting
πŸ”΅ EV Charger Installations
πŸ”΅ Partial & Full Re-Wires
πŸ”΅ PAT Testing
πŸ”΅ Call-outs & Emergency Call-outs

πŸ”΅Get In Touch For a FREE Quotation
πŸ”΅ [email protected]
πŸ”΅ 07500047499

Emergency Fuseboard replacement today. Thermal damage to the Neutral bar and a welded in Busbar to the breaker. All caus...
09/06/2026

Emergency Fuseboard replacement today. Thermal damage to the Neutral bar and a welded in Busbar to the breaker. All caused by loose connections.

Fusebox 15 way with Surge Protection & full RCBO Protection for all circuits at this property.
New Board torqued up to the correct manufactures settings to avoid anymore issues for this customer.

This shows the importance of keeping your Electrical Testing & Inspection up to date.

πŸ”΅ Electrical Contractors
πŸ”΅ Commercial & Domestic Installations
πŸ”΅ Electrical Installation Condition Reports
πŸ”΅ LED Lighting Upgrades
πŸ”΅ Emergency Lighting
πŸ”΅ EV Charger Installations
πŸ”΅ Partial & Full Re-Wires
πŸ”΅ PAT Testing
πŸ”΅ Call-outs & Emergency Call-outs

πŸ”΅Get In Touch For a FREE Quotation
πŸ”΅ [email protected]
πŸ”΅ 07500047499

New dedicated 32A circuit installed for a 4kW Cooker that had been causing thermal damage to the socket outlet. -20mm co...
05/06/2026

New dedicated 32A circuit installed for a 4kW Cooker that had been causing thermal damage to the socket outlet.

-20mm conduit containment.
-Cooker connection unit with correct ferules on finely stranded H07 cable.
-50A double pole isolator.
-New 32A RCBO installed in existing Distribution Board.

πŸ”΅ Electrical Contractors
πŸ”΅ Commercial & Domestic Installations
πŸ”΅ Electrical Installation Condition Reports
πŸ”΅ LED Lighting Upgrades
πŸ”΅ Emergency Lighting
πŸ”΅ EV Charger Installations
πŸ”΅ Partial & Full Re-Wires
πŸ”΅ PAT Testing
πŸ”΅ Call-outs & Emergency Call-outs

πŸ”΅Get In Touch For a FREE Quotation
πŸ”΅ [email protected]
πŸ”΅ 07500047499

Install of 2 Easee 22kW EV chargers today for our customer ahead of the arrival of their EV vehicles β€’25mm conduit conta...
18/05/2026

Install of 2 Easee 22kW EV chargers today for our customer ahead of the arrival of their EV vehicles

β€’25mm conduit containment & use of existing 50x50 galvanised trunking for new circuits.
β€’Replacement Distribution Board to allow for new circuits, and install Surge Protection Device.
β€’Fusebox 40A TPN RCBOs.
β€’40A Isolators for each charger.
β€’2 Easee 22kW Three Phase Chargers in Black.

Easee is our go to Commercial EV Charger. Fantastic product and easy App to use/commission.

Did you know the OVEZ grant was increased from Β£350 to Β£500 off per charger. OVEZ grants changed from on 1st April this year.

Get in touch if your looking for a EV installation

πŸ”΅ Electrical Contractors
πŸ”΅ Commercial & Domestic Installations
πŸ”΅ Electrical Installation Condition Reports
πŸ”΅ LED Lighting Upgrades
πŸ”΅ Emergency Lighting
πŸ”΅ EV Charger Installations
πŸ”΅ Partial & Full Re-Wires
πŸ”΅ PAT Testing
πŸ”΅ Call-outs & Emergency Call-outs

πŸ”΅Get In Touch For a FREE Quotation
πŸ”΅ [email protected]
πŸ”΅ 07500047499

External canteen install completed for our customer. Safe & Compliant. β€’Scolmore Click Accessories β€’D-Line Conduit clips...
12/05/2026

External canteen install completed for our customer. Safe & Compliant.

β€’Scolmore Click Accessories
β€’D-Line Conduit clips.
β€’2kW Panel Heater + 10L Under Sink Water Heater
β€’50 metre 10mm SWA supported with correct fire rated fixings
β€’JCC Niteflood 10W Floodlight
β€’Hager Distribution Board with RCBOs

πŸ”΅ Electrical Contractors
πŸ”΅ Commercial & Domestic Installations
πŸ”΅ Electrical Installation Condition Reports
πŸ”΅ LED Lighting Upgrades
πŸ”΅ Emergency Lighting
πŸ”΅ EV Charger Installations
πŸ”΅ Partial & Full Re-Wires
πŸ”΅ PAT Testing
πŸ”΅ Call-outs & Emergency Call-outs

πŸ”΅Get In Touch For a FREE Quotation
πŸ”΅ [email protected]
πŸ”΅ 07500047499

Temporary power going in for our customer. National Grid have attended site to relocate existing service head & meter. 7...
24/04/2026

Temporary power going in for our customer. National Grid have attended site to relocate existing service head & meter.

700mm x500mm IP metal enclosure on 41mm strut support.
4 Way Single Phase Fuseboard being installed for temp socket power for contractors & 63A supply for existing outbuilding.

πŸ”΅ Electrical Contractors
πŸ”΅ Commercial & Domestic Installations
πŸ”΅ Electrical Installation Condition Reports
πŸ”΅ LED Lighting Upgrades
πŸ”΅ Emergency Lighting
πŸ”΅ EV Charger Installations
πŸ”΅ Partial & Full Re-Wires
πŸ”΅ PAT Testing
πŸ”΅ Call-outs & Emergency Call-outs

πŸ”΅Get In Touch For a FREE Quotation
πŸ”΅ [email protected]
πŸ”΅ 07500047499

Address

Deanshanger
Milton Keynes

Telephone

+447500047499

Website

Alerts

Be the first to know and let us send you an email when BK Electrical posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share