13/10/2026
Foundation work completed for a timber-framed garage, built using blue engineering bricks and set out precisely to the manufacturer’s drawings and measurements to ensure the frame fits perfectly. 🧱📐
A retaining wall also constructed around the perimeter, ready for the groundworkers to complete the tarmac finish.
Another job done right, with precision from the ground up. 💪