04/04/2025
What a great start to the year. Weather has been amazing, maybe a little cold at the beginning but this didn’t slow us down! Took on groundworks for two new builds and had our last day today. Come with a few challenges. Site was covered with overgrowth and lots of trees. Road had to be excavated to gain access to the site. Then we was able to start pulling foundations, running electric, water and BT to the plots and all surface water and foul drainage completed. Patios and paths excavated and hardcored. Ready for the timber frames to be erected.