ASR Builders

ASR Builders ASR Builders pride ourselves on producing high quality work, we are proud of our attention to detail

It’s been a busy few weeks for us in Aylsham. Roofing all finished and scaffold down. Internal walls and alterations don...
13/06/2025

It’s been a busy few weeks for us in Aylsham.

Roofing all finished and scaffold down.
Internal walls and alterations done.
New window cut into bedroom with new lintels.
First fix completed by the customer.
Plaster boarding complete and almost fully skimmed.

Great work by Aylsham roofing services Ltd.
Helping us out on the roof and pushing the project on.

Next week we will get the floor insulation down and ready for Anglia flow screed to do their thing.

Roof on at Aylsham. Scaffold up, roof trusses installed and block gable done. Next up will be fascias, guttering, felt, ...
24/05/2025

Roof on at Aylsham.

Scaffold up, roof trusses installed and block gable done.

Next up will be fascias, guttering, felt, batten and tiling!

Progress over at Aylsham. Internal and external block work up-to wallplate height. 90mm PIR cavity insulation and foil t...
18/05/2025

Progress over at Aylsham.

Internal and external block work up-to wallplate height.

90mm PIR cavity insulation and foil taped to meet current regulations whilst keeping internal space to a maximum.

Ready for scaffold and roof trusses.

New extension started this week in Aylsham. Nice to be back to this place where completed a rear extension, internal wor...
02/05/2025

New extension started this week in Aylsham.
Nice to be back to this place where completed a rear extension, internal works and a re roof back in 2019!

Foundations dug and concreted, trench blocks down and internal skin up to concrete height, internal fouls drainage installed upto the first inspection chamber, rainwater extended ready to be connected to a new soak-away.

Tunstead extension all wrapped up from us and handed over to the customer to finish off. This job for us was just a “she...
23/04/2025

Tunstead extension all wrapped up from us and handed over to the customer to finish off.

This job for us was just a “shell only” which included, new foul drainage and rainwater drainage into a new soakaway system, foundations, brick and blockwork, floor insulation and screed, steel installation and rear wall removal, warm deck flat roof with EPDM finish, roof lantern up stands and we also fitted the roof lights.

These lovely customers have taken on a huge project transforming his old run down bungalow into a modern family home. Having taken on a lot of the work themselves there is still a long way to go but I’m excited to see the finished product and wish them all the best in this new experience.
A massive learning curve for them but from designing every detail themselves from the beginning it will be worth all the hard work once finished.

Progress at Tunstead. All roof timbers and firing strips installed. Brickwork completed. Steel beam installed along with...
28/03/2025

Progress at Tunstead.

All roof timbers and firing strips installed.
Brickwork completed.
Steel beam installed along with wind posts.
First osb deck down and covered with the edpm rubber roof to keep everything protected.

Looking a little different at Tunstead now 👀 Scaffolding up, flat roof taking place, walls removed ready for steel beam.
21/03/2025

Looking a little different at Tunstead now 👀
Scaffolding up, flat roof taking place, walls removed ready for steel beam.

Tunstead extension coming along. Brickwork and blockwork upto lintel height.
14/03/2025

Tunstead extension coming along.

Brickwork and blockwork upto lintel height.

Progress at Tunstead, what a difference the weather can make ☀️ All grounds complete. Oversite prepped with hardcore bas...
05/03/2025

Progress at Tunstead, what a difference the weather can make ☀️

All grounds complete.
Oversite prepped with hardcore base, sand blinding, damp proof membrane, reinforcement over drainage runs and finally concrete slab poured.

We also installed a new soakaway and all underground drainage ready to take downpipes when roof is complete.

What a lovely week to be doing drainage 🌧️ ☔️ We persevered though and got all main drains dug, installed, connected, in...
28/02/2025

What a lovely week to be doing drainage 🌧️ ☔️
We persevered though and got all main drains dug, installed, connected, inspected and back filled.

Monday / Tuesday saw us get all trench blocks laid and bricked upto damp proof course and internally up-to concrete height.

Next week we will finish the soakaway and rainwater drainage, prepare the over site with hardcore ready for concrete slab.

Progress pictures from the Aylsham flat roof extension.
26/02/2025

Progress pictures from the Aylsham flat roof extension.

Flat roof rear extension in Aylsham back in November / December.
26/02/2025

Flat roof rear extension in Aylsham back in November / December.

Address

Aylsham
Norwich
NR116JQ

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when ASR Builders posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ASR Builders:

Share