A.P.N Brickwork

A.P.N Brickwork A.P.N Brickwork – nine years and counting of specialising in new build homes, extensions, foundations

Full rake out & repoint started this week in Gorleston Nr31. perfect weather for it! Scaffold supplied by Certified Acce...
06/03/2026

Full rake out & repoint started this week in Gorleston Nr31.
perfect weather for it!

Scaffold supplied by Certified Access Scaffolding ltd.
Follow along for more updates

Repair works completed in kings Lynn on Monday for an insurance company.Knock down the damaged section and rebuilt.
05/02/2026

Repair works completed in kings Lynn on Monday for an insurance company.
Knock down the damaged section and rebuilt.

Rake out and repoint completed in costessey on Tuesday. Mortar washed out due to a faulty gutter end cap. Repointed in a...
23/01/2026

Rake out and repoint completed in costessey on Tuesday. Mortar washed out due to a faulty gutter end cap. Repointed in a colour matched NHL lime mix to suit original.

Brick and block garden wall knock down and rebuild.Insurance job as a car crashed into the original.Added an opening for...
21/01/2026

Brick and block garden wall knock down and rebuild.
Insurance job as a car crashed into the original.
Added an opening for a gate to be hung.
All brickwork undertake call or text for a free Quotation.

Curved garden wall repair in December.Rendering completed by mowles Plastering
21/01/2026

Curved garden wall repair in December.
Rendering completed by mowles Plastering

Gable end rake out and repoint in a 4:1 NHL 3.5 due to being repointed in sand and cement causing internal damp issues. ...
21/01/2026

Gable end rake out and repoint in a 4:1 NHL 3.5 due to being repointed in sand and cement causing internal damp issues. Completed in December.
Scaffold provided by certified access scaffold.

Garden boundary wall build to suit original wall.Topped with blue engineering bricks
21/01/2026

Garden boundary wall build to suit original wall.
Topped with blue engineering bricks

Concrete greenhouse base with a patio completed in summer.
21/01/2026

Concrete greenhouse base with a patio completed in summer.

Iron railings installed using 10mm threaded rod drilled in 200mm and chemical fixed in securing the edge of a patio for ...
23/10/2024

Iron railings installed using 10mm threaded rod drilled in 200mm and chemical fixed in securing the edge of a patio for a returning customer

Floor screed and bricking up entrance to an old coal bunker with a fresh skim of plaster in costessey
23/10/2024

Floor screed and bricking up entrance to an old coal bunker with a fresh skim of plaster in costessey

Address

21 Kestrel Avenue
Norwich
NR85FT

Alerts

Be the first to know and let us send you an email when A.P.N Brickwork posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to A.P.N Brickwork:

Share