15/09/2026
As part of the refurbishment and extension of 105 Judd Street in London, VariBlast carried out blast cleaning of structural steel in preparation for a subsequent intumescent coating application.
Our team’s work involved preparing the structural steel to the required standard, removing surface contaminants and providing a suitable base for the protective coating system that follows.
📷 Pictured are images from our on-site survey, providing an insight into the scale of the works and the condition of the structural steel prior to preparation.
Read more on our website: https://variblast.com/?p=6326