Simon Earp Building Contractors

Simon Earp Building Contractors Over 30 years building experience:
Groundworks
Extensions
Alterations
Conversions
Newbuilds

31/08/2026

Sunday & Bank Holiday Monday on site 🔨

No bank holiday for us! 💪

Getting stuck into the next stage of the build — DPM down and blockwork loaded out, ready to keep things moving.

Progress doesn’t stop just because it’s a bank holiday! 🧱🏗️

28/08/2026

Black doors 🖤 | Start to finish

A little transformation from start to finish.
From installation to the final finish — these black doors have completely changed the look of the space.

Simple, timeless and seriously stylish. 🖤

25/08/2026

🏗️ An outbuilding for a village hall…

It’s been a while since I’ve built in brick! 🧱 Living and working in Cornwall, most of our building work is blockwork, so it was great to get back to brick on this one.

This was my last job in the Midlands before heading back home to Cornwall.

A proper change of scenery — and a great project to finish on! 👌

23/08/2026

Back from the Midlands and straight into a Sunday repair job! 🔨

Removing rotten fascia and soffit and replacing them with new tantalised timber, ready for the customer to paint .

No rest for the builders! 💪 Another repair job completed and the roofline looking fresh again.

21/08/2026

Stage 3 — Final Stage 🛠️

The final layer is down! 👌

A layer of flexible self-levelling compound is applied over the heat mat, creating a smooth, level surface ready for the next stage.

⏱️ 2–3 hours setting time

Once set, it’s ready for tiling — bringing us one step closer to the finished floor. ✨

20/08/2026

Stage 2 | Preparing the Existing Floor

Before the next stage can begin, the existing floor is carefully prepared and primed to create the perfect surface for the works ahead.

Preparation is key — ensuring a clean, sound and properly primed surface for the next layer. 🔨

14/08/2026

Stage 1: Floor Levelling 🏗️

At Simon Earp Building Contractors, we undertake all types of building work, from the initial groundwork through to the finishing touches.

Stage 1 of this project is getting the floor perfectly level and prepared, ready for the underfloor heating system to be installed.

A solid, precise foundation is essential for achieving the best finish and performance as the project progresses🔨

13/08/2026

A beautiful new build, brought to life with quality craftsmanship and attention to every detail. ✨

From the foundations to the finishing touches, every element has been carefully considered to create a home that feels as exceptional as it looks.

A true combination of modern design, timeless style and high-end craftsmanship.

Another project we’re incredibly proud of. 🏡

11/08/2026

SHOWCASING OUR WORK

A closer look at one of our luxury new-build homes.

Beautifully considered design, exceptional craftsmanship and meticulous attention to detail throughout.

From the structure to the finest finishes, every element has been carefully executed to create a home of outstanding quality.

Built with precision. Finished to an exceptional standard.

08/08/2026

Concrete floor slab being poured 🏗️

Another important milestone on site as the concrete floor slab is poured, levelled and finished.

A solid build starts with getting the foundations and groundworks right — quality materials, careful preparation and attention to detail at every stage.

Another step closer to bringing this project to life. 👌🏼