04/09/2026
Is your home ready for the rain?
This garage in Plymouth had been experiencing water ingress, so Oakley Builders were brought in to tackle the problem before it became a much bigger one.
The team excavated around the garage and retaining wall before carrying out the necessary waterproofing works, including tanking, a waterproofing membrane and appropriate drainage to help protect the garage from further water ingress.
The area was then backfilled and topsoil added, ready for the grass to go back down.
With the garage now protected, it can start to dry out and the customer can have peace of mind that their belongings are better protected too.
And with wetter and stormier conditions possible across the UK this autumn and winter, now is a good time to get those niggling leaks and water ingress issues looked at.
That small leak you've been meaning to sort? Don't wait until it's a much bigger problem!