01/09/2026
Before and after from a timber frame job we just completed today. ✅
Pipework was already down when we arrived, so it was just the screed for us on this one. Poured, levelled and out the same day. Came up perfectly as always. 🥳
Flowing screed incases the heating pipes completely so you get the best heat transfer, and the floor’s completely level and flat for whatever finish is going down after. Makes life a lot easier for the joiners and tilers coming in behind us. 🤗
We do the full floor build-up as well if you need it — insulation, underfloor heating and screed all from the one contractor.
One contractor. One point of contact. Less problems. 👌
Thanks to our suppliers for there help on this one. 🙌🏻
Based in Perth, covering all of Scotland. Give us a shout if you’ve got a project coming up. 🥰
🏴