30/05/2026
🤩 Slap Through With New Dressed Sandstone Surround
Another cool project to be involved in where we were tasked with opening up the gable end, supplying, dressing & fitting new stone to create a tidy French Door surround.
The design was like for like copied from the front of the building with the tall rybats and longer tie bands throughout.
We also installed 2 new window cills for floor height windows to be installed.
The gable also finished off with some fresh pointing.
Thanks to our pals at S. Brechin Builders for carrying out the Slapping works, helped us out massively to give us time to procure the stone for the project and have it dressed in time.
Construction work is all about deadlines and without a finished slap and opening things such as poured concrete, internal kit walls or sizing and ordering windows & doors couldn’t have happened within schedule.
Thanks to our clients .dream.home for having us!