22/10/2026
A bent beam goes straight onto the repair list, but a missing ACM safety pin or a load notice that has been torn, faded or knocked off a bay should not be overlooked either.
Before peak season, any damage found on a racking inspection needs fixing before the site gets busier. That can mean replacement components for damaged racking, new mesh decks or anti-collapse mesh where they have been affected, and new signs wherever the old ones can no longer
be read.
If the same uprights or aisle ends keep taking impacts, a repair is also the right time to add racking protection or barriers, so the damage is less likely to recur during the increased traffic of a high-demand period.
With repairs, lead time matters. We hold common products in our QS Hub stock for short lead times, and QTS can supply the racking, storage, safety, and signage parts of a repair together, so you deal with one supplier, not several for one site.
Many products can be quoted and ordered on Quote to Site® straight away: https://eu1.hubs.ly/H0yX4nS0
If you are a trade customer and are not yet using Quote to Site® then request a login here: https://eu1.hubs.ly/H0yX4DS0