Morning everyone, I hope you are all well and enjoying this beautiful weather!.Back in January, we started a new job which consists of a large Extension with 2 squints in the design to maximise the space adjacent to the rock face, along with extending a large extension to the decking area. To do all this, massive retaining walls have been designed & Built, steels have been designed & installed. And so on..
Weeks & weeks of excavating rock out, Disposing it away, carrying up materials which are being handled 3/4 times before being used, so much work involved but only a fraction noticed or seen.
Please see our before & After photos of the progress so far. The site access and location is one of the toughest we’ve done, good job we are well geared up for it and have the best quality & experience in these circumstances. A big Thank you to all my Lads who have worked tirelessly as always in a very tough location, in very hot conditions, I’m sure you can imagine getting all these steels up to the site from the village centre was a mission.