19/03/2026
Job completed in Criccieth. Installed a suspended timber ceiling to conceal new cables and pipework. Constructed stud walls on the staircase and at the entrance to divide the space in half. Fitted fireline plasterboard to all timber surfaces, with standard dot-and-dab boarding elsewhere. Finished throughout with a full skim to a high standard of work.