Williamson's Joinery & Building Contractors

Williamson's Joinery & Building Contractors Joiners & Builders

Wall removal and steel installation completed this week in Ulverston. Plastering to be completed by others.
27/02/2026

Wall removal and steel installation completed this week in Ulverston. Plastering to be completed by others.

New composite door installed today in Preesall. The original is one we installed over 20 years ago.
20/02/2026

New composite door installed today in Preesall. The original is one we installed over 20 years ago.

New kitchen installed in Lancaster. Finished off this week after the new quartz worktops were installed.
17/02/2026

New kitchen installed in Lancaster. Finished off this week after the new quartz worktops were installed.

Proud seat sponsor of Pilling Jubilee Silver Band
13/12/2025

Proud seat sponsor of Pilling Jubilee Silver Band

New bathroom installed in Stalmine with T W Heating nw ltd. The bathroom was in a poor state due to the shower and bath ...
04/12/2025

New bathroom installed in Stalmine with T W Heating nw ltd. The bathroom was in a poor state due to the shower and bath leaking. Everything was stripped out, replumbed, all walls redone and plastered, new floor, new extractor fan, relocation of sink, a new shower cubicle, ply core shower panels, new towel rail, new mirror cabinet and a comfort height toilet installed. Electrics done by TDC electrical ltd.

New patio doors installed for easier access to the garden. Trickle vents installed in the head of the doors to meet curr...
09/11/2025

New patio doors installed for easier access to the garden. Trickle vents installed in the head of the doors to meet current regulations.

New solidor composite door installed in knott end-on-sea
16/08/2025

New solidor composite door installed in knott end-on-sea

Bathroom completed with TW heating in bolton-le-sands this week.  Electrics by TDC electrical.
12/07/2025

Bathroom completed with TW heating in bolton-le-sands this week. Electrics by TDC electrical.

Job completed in Lancaster last week. We opened up an unused loft space behind a stud wall, insulated the area including...
15/05/2025

Job completed in Lancaster last week. We opened up an unused loft space behind a stud wall, insulated the area including walls/roof. We installed floor joists and new flooring. All plastered out plus new skirting boards & architraves were installed.

Job completed today in kendal. Old door and frame taken out. New studwork and double doors installed.
24/04/2025

Job completed today in kendal. Old door and frame taken out. New studwork and double doors installed.

A new downstairs shower room completed in Lancaster. The stud wall was moved to give more space for a larger shower. Ass...
09/03/2025

A new downstairs shower room completed in Lancaster. The stud wall was moved to give more space for a larger shower. Assisted by TW heating, kristian Amer tiling and Tdc electrical.

Address

Preesall

Telephone

+447980801749

Website

Alerts

Be the first to know and let us send you an email when Williamson's Joinery & Building Contractors posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share