18/01/2026
Before after and during we removed the customers old bathroom, then tiled the walls , laid ditra Mat on the floor and tiled the floor we also re plastered the Celling and installed a new light .them we installed the bathroom suite all materials was supplied by us and come with a 2.5 year guarantee. The customer was over the moon with the transformation.